Five weeks later, the work in my apartment is finally completed. It involved moving a window from one wall facing 10 Federal, to the other wall facing 205 Bridge St. This is done so that a 2nd elevator can be built next to my unit.
It took more time than we were told it would (almost always the way) and the contractors could have communicated with me a little better (name a job with too much communication!) but it was done without much stress.
I'm hoping to document the rest of the project but I'm not sure how much I'll be able to see; the construction site is at an inaccessible corner of the property and foliage is everywhere.