Showing posts with label transit. Show all posts
Showing posts with label transit. Show all posts

Monday, October 17, 2011

My years of futility in Salem transit, part 2

Route 459-Derby St

Following up on my last post, I’m wondering why we just can’t get things done to improve our public transit and make our streets safer for pedestrians and people with disabilities.

I’m signed up with the MBTA to get service alerts for bus routes I regularly use, which would be the 450, 451, 455, 456, 459 and 465.  I just got an alert now:

Routes 455 & 459 are experiencing 15-20 minute delays due to traffic.

10/17/2011 4:07 PM

This has been a regular occurrence.  Normally, I’m not concerned about delays here and there because buses run in traffic and are susceptible to the same delays that affect motorists trying to go down 1A and 107 on their way to and from Salem.

But there’s been a disturbing increase in traffic congestion that has happened in all months at most times of the day in the North Shore.

The MBTA schedules have been severely affected;  looking at Route 456, the frequency of service is now 80 minutes.  That means 1 hour and 20 minutes between buses.  This route once ran hourly when it was established in 2002.  (The 456 is a busy route that serves Central Square by way of Highland Ave., and the many Lynn residents who shop and use the medical offices in Salem.)

The 450 has been affected as well.  In fact, during weekdays, none of the MBTA routes out of Salem Depot run hourly.  The 465 that serves the Peabody-Danvers shopping area runs about every 1 hour and 10 minutes (70 minutes).

Even on weekends, the 455W, Salem to Wonderland, no longer runs hourly, but also slips 5 minutes here and there throughout the day.

This single bus route is the most frequent, and busiest, of all of the MBTA’s Salem routes.  Before the 455 was split into the 455 and 459 routes (the latter going to Logan Airport and South Station on weekdays), it ran every 30 minutes, as does the 455W weekend service to Wonderland.

I have taken that route many times and I can tell you it is crowded.  If you come home from Boston and elect to get off the Blue Line at Revere Beach (one stop short of Wonderland), you will not get a seat on the bus.  (The bus shelter at Revere Beach is much nicer than the one at Wonderland so I board there any time I can.)

Remember also that the MBTA runs many, many other routes to and through Lynn, and to Swampscott and Marblehead.

Here is an exercise for those who doubt this:  Drive down either Route 1A (the Lynnway) or Route 107 (Western Ave.) and pull into a lot somewhere before Revere.  There are a number of Dunks around so pull in with a medium regular and your choice of donut.  Normal business hours are fine, day or evening.

Find an MBTA bus that is marked for service on its LED sign (other than “NOT IN SERVICE” or “NO STOPS”).  Count how many people are onboard;  you don’t need to be exact.

Count the buses and count the people.

You’ll probably find a lot more buses and a lot more riders than you think.  These people are heading to and from work, to and from doctor appointments, daycare, shopping and even church.

Critics of transit spending like to say that you can’t make demand by spending on big capital projects like, say, the Blue Line extension to Lynn.

But the people are already here!  They’ve been here for a long time.  They come whenever the latest condos get built on Highland Ave.

And those who don’t take the bus, drive.  Yes, I know I am in the minority of people who do not drive and yes I am lazy, didn’t overcome my disabilities, and so forth.  I know all that.

But I know, too, that in any urban area, when the density of people gets above a certain point, it’s time to consider investing in public transit, simply because the road networks will strangle the very communities that depend on them.

That time’s now.  It’s been “now” for years.

No public official will say this, because the scariest thing they could imagine is to have Barbara Anderson and the Tea Party at their door screaming “NO NEW TAXES!”  I’ve heard that before, I’ve heard it for years and years and years.

And, certainly, Salem is wealthy enough in the short term that the Tea Party platforms could “work”.

For a short while, anyway.

Will the shiny, happy, good, new (and rich) residents of Salem tolerate not being able to leave their driveway, not only in October, but year-round?  The traffic jams of Halloween in Salem are legendary, but the dirty truth is that they happen just as readily on a cold twilight afternoon in January.

I fear something even worse:  The Massachusetts Senate has approved a casino gaming bill.   In the bill, which still has to go to a conference committee to be finalized, there would be three destination casinos in the state.  One of them would be near Suffolk Downs.

The owners of Suffolk Downs have long looked to slot machines to provide the revenue they need to keep the horse track running;  horse racing as a sport has been on a long slow decline for decades and the track was once known as “Sufferin’ Downs” for good reason.

The owners recently bought Wonderland, the defunct dog track near the Blue Line that was closed after Mass. voters approved a referenda to ban greyhound racing.  Wonderland is where most people think a slot parlor may go on the North Shore.

It’s the northern end of the Blue Line.  And it is the worst migraine headache for me and all of us on the North Shore.  And it will happen.   There’s too much money being tossed around in executive suites and the State House to think otherwise.

Both my mayor and my rep, Driscoll and Keenan, are supporting casinos.  They’re doing so, I suspect, because of the hope of increased state revenue for cities and towns, the selling point most used by our state lottery, and they are hoping for infrastructure (roads & transit) improvements.

I’m not going to guess on the revenue, but I will guess that the casino operators won’t invest as much in the infrastructure as we would like.  They don’t need to.

They don’t need a Blue Line extension;  most of their customers will drive, and the few who don’t can be served by leasing a few dozen shuttle buses.  We’ll see them everywhere once the casino opens.  (They will also become the default recreational option for senior centers, but that is another matter.)

They won’t need to invest in anything else;  the casinos of Foxwoods and Mohegan Sun are, like most, self-contained so the visitor doesn’t need to go anywhere else.  Nowhere else but there to spend money!

Mayor Driscoll is deluding herself if she thinks this won’t ripple into Salem’s tourist revenue.

What casinos will surely do is clog up the roads and make it impossible for anyone in buses or cars to get around.

Unless, of course, you are going to the casino yourself.  That will be easy.

Otherwise, not so much.  The decay of the T will continue and no one will care.  What have I been doing for 4 years, again?  Will it matter?

My years of futility in Salem transit, part 1

Highland Ave at Pep Boys

In my last post, I updated the status of Salem Depot and its endless revisions and delays.  A little further south of downtown, there’s another situation that I am reminded of again and again.

I’ve long wrote about the Market Basket bus stop and the problems navigating to it in the winter.  Around this time of year, most of us are shopping for new winter boots and hoping against hope that the upcoming winter will be mild, or at least with little snow.

This picture outside Pep Boys showed that this was not to be, early in 2011.  In 2010, the Commission hoped that the MBTA would route buses through Market Basket to eliminate the problem.

That was also not to be;  the MBTA declined the idea.  The Market Basket plaza was never designed for buses, the routes would be delayed going through there, but most importantly, the abutter to Market Basket—the adjacent shopping complex with Shaws and TJ Maxx, objected.

There will be no new bus stop in the winter of 2011-2012 and, I fear, there may never be.

Since I’ve started this blog, I have heard regularly from a gentleman, a former city councilor, who’s been upset over the bus stop and its snowbanks.

Like clockwork, I’ll hear from him when Mayor Driscoll announces funding for some new project (“She can spend $XXXXX for something but not on the bus stop!”)

Repeatedly.

He’s made me even more cynical than I am already.  I have seen and known enough about government to know that the fact of Mayor Driscoll seeking to start some project or another is totally orthogonal and unrelated to that bus stop.  I didn’t even vote for her but I have expressed my thoughts on transit to her and other elected officials regularly.

Most people who’ve been outraged over this issue have cars and don’t need to wait in the snow for the bus!

I use that bus stop regularly. If I get run over standing next to a snowbank one gray chilly day, isn’t that poetic justice?  Given what the Tea Parties say about government and those who work for it, I wouldn’t expect an ounce of sympathy from anyone if that happened!  I don’t know the politics of my correspondent, but I do know a lot of people his age who parrot  the “hard work and personal responsibility” trope of the Tea Parties so often that it is just screaming noise.  (Obviously, I didn’t work hard enough to overcome my vision problems so I could drive!)

And my correspondent is an ex-city councilor!  I feel that if you are a current city official or even a former city official, you have an obligation to answer when someone asks, “What did you do to make Salem better when you served?”

I’d like to ask my correspondent what he did when he had the reins.

I know that in 4 years and 1-1/3rd terms into my service on the Commission on Disabilities, I have to ask myself that question every time I get up in the morning and every time I sit in our conference room at SATV every third Tuesday.

I’m beginning to wonder if I can really answer that.  Thoughts in my next post. 

Saturday, July 3, 2010

No New Bus Stop at Hawthorne Square

 

Highland Ave North at Market Basket

For some time, I and the Commission have been trying to get the MBTA to establish a bus stop inside the parking lot at Market Basket.  

Last fall, we thought we were making progress.

A colleague of mine got a response from Keenan’s office, quoted here:

In a message dated 2/1/2010 10:22:55 A.M. Eastern Standard Time, Lynne Montague writes:

Hi Rich,

I wanted to get back to you with the latest information provided by the MBTA on the Highland Ave Bus Stop.  John Matthew at RMD , Hawthorne Square Mgmt has withdrawn its proposal to build a new bus shelter as the company stated it could no longer justify the expense.  The company further noted that the path for the bus, that the MBTA had agreed to, was objected to by the neighboring shopping plaza.

Mr. Matthew said he would contact the MBTA if he learned anything new or if the management company wanted to make a new proposal.  The city of Salem has instructed RMD, Hawthorne Square Mgmt that the bus stop must be cleared of snow.

I will let you know if there is any additional information on this proposal.

Best,

Lynne

Firstly, I’m uncertain as to what kind of expense is involved.  We never heard any kind of dollar figure;  was this to be an actual physical shelter?  I’d understood this would be just a bus stop in the vicinity of Market Basket.

Since I first drafted this post back in February, I've gotten some more information that puts a little light on this story.  The Commission got a copy of a letter to the Mayor's office from the MBTA, specifically from a senior planner/analyst:

The layout of this shopping center does not support a regular bus service. This facility is designed with a large parking lot, few walking paths, and multiple storefronts that would create conflicts between buses, autos, and pedestrians. With the present layout, there is no appropriate place for passengers to board, exit, or wait for the bus. We would be interested in discussing this situation with the management, owners, and/or tenants of Hawthorne Square to see if there are possibilities for making changes or additions inside the center which might create an appropriate bus waiting area area and safe path for the bus to drive through Hawthorne Square.

The Service Planning group is also concerned with the additional trip time a rerouting would impose on existing customers. We estimate that each customer trip would be lengthened by 4 minutes or mour if routed via the shopping center. Extending selected trips during weekday midday hours or on weekends could minimize the additional passenger-travel time, since there are fewer peak-period commuters who would be negatively affected by such an extension and delays from traffic are less severe.

Snow removal is a serious issue that affects the quality of a bus customer’s trip; ordinances vary by municipality. In general, snow removal on sidewalks or at bus stops is the responsibility of the abutting property owner.

The Route 107 corridor has never been quiet, except perhaps before I was born, but it is true that it has gotten more congested.  In fact, the T has had to run fewer buses with increased headways (80 minutes on weekdays) on the 450 and 456 routes due to heavy traffic on Highland Ave.

Ms. McCoy is also correct in asserting that the Hawthorne Square parking lot is not really laid out for pedestrians--there are no reserved pedestrian paths between stores.

This problem is much more than just one elderly person trying to get to the grocery store from the bus.

It's about how we have emphasized the personal car above everything and arranged our city planning around the car and its needs for parking at peak periods.

The only answer we seem to have is "more development".  While I (personally, not the Commission) cautiously favor the new Wal-Mart proposed on Highland Ave. (and disfavor Lowes), I'm not sure how this will help.

As it is, the Commission has de facto "adopted" Rt. 107, 1A, 114 and all the other entrance corridors in the city where pedestrians and people with disabilities travel. 

MassHighway has control over many of these corridors, so city councilors cannot do a lot.  Jean Pelletier and Jerry Ryan are the nominal councilors over Rt. 107's path;  I have not spoken to Jean but Jerry knows my thinking on this and we have spoken numerous times.

I recently had to contact MassHighway to fix one of the new audible signals (ironically near Market Basket).  After two months it's resolved, but someone needs to go out there to adjust its volume.

A call here, an email there, a tweak.  Until the next issue. 

Now, the talk of my state rep and my mayor is on casinos and pledges to improve 1A and 107, which will certainly serve the proposed resort at Suffolk Downs.

A tweak here, a tweak there.

People won't like this solution, but the community leaders in the region will have to push for the Blue Line to Lynn.  Just stand on the Lynnway near Wal-Mart or on Western Ave. past the bus depot and count how many buses with passengers go by.   It's more than you think.

With due respect to my colleague Rich, who never fails to give me a word against the city on this issue, it's a tough one.

And the Commission seems to be alone in fighting for this.

Sunday, May 9, 2010

Salem Commission on Disabilities April 2010 Unofficial Minutes

[Sorry for the delay.  No pictures this post—DM]

The Salem Commission on Disabilities met on April 20th, 2010 at 4:00 PM.

Present: Jack Harris, Debra Lobsitz, Andy J. LaPointe, David Tracht, David Moisan, Charlie Reardon, David Martel and Jean Harrison.

Mike Taylor was unable to attend. Jean Levesque and Mike Sosnowski were not present.

Old Business--MBTA Bus stop, Market Basket

Jack: As most of you know, with the help of David Moisan, we’ve brought attention to the T bus stop at Market Basket. The city, with the help of Market Basket and the MBTA put a meeting together with suggestions. It has stalled. Not sure how, but in my discussions with Jason Silva, it ran into a roadblock. Market Basket and the T had a discussion, thought it was a good idea, MB offered to construct a shelter. But the T backed off, didn't like the location of the shelter.

I called Mr. Mathews to arrange a meeting with Jason in hopes of getting this done. It’s a safety issue.

Dave Moisan: I’d gotten a message from Richard Swinuch that he’d got from Keenan’s office; the abutter of MB (Shaw’s plaza next door) did not approve of the bus routing.

Jack: MB was going to pay for the bus shelter to be on their side of the mall.

Watch the Walmart/Lowes project--new stoplights and crosswalks are in now in the area but there could be reconfiguration. Several other stops on Highland Ave. present the same problems but the MB stop is the most notable.

MBTA New Garage at T lot

Jack: As some of you know, we won part of the fight: There will be a full-height platform--walk from the platform straight to the train (no steps). Now, we want a canopy over the whole platform. Previously, the T was citing money issues, plus the platform is on a curve and they didn't want to do it. From discussion with several people from the state, this is a win-win.

Charlie: There will be more wheelchair passengers, now that they can more easily board. Scott Maguire (friend of Charlie’s) once had to ride in the back of a baggage car.

Jack: This will help people on foot who won’t have to go up on steps.

David Martel: Will the boarding area be enclosed?

Jack: The T is still accepting comments.

Jean Harrison: They are more aware of the disabled.

Jack: A $300 million judgment (against the MBTA) will do that.

David Martel: Not to mention the curb cuts all over Salem. People take them for granted and if we took even half of them out, people would notice.

When we did the Access Monitor training, so many people from outside came to Salem and realized how good our access is compared to other places.

Charlie: The Witch Museum is accessible.

David Martel: Many of these people could grandfather out of the ADA requirements but they go ahead and make things accessible. Biff Michaud did that with the Witch Museum.

They put a lot of reenactments downstairs to make them accessible.

Andy: Another comment on the train platform; you may go on the train several times and not have any problems, but once you may have a problem. I had to call for my stop once and the train stopped halfway to Beverly. They had to back up to the station.

Jack: First rule: Disabled people need to let the conductor know where they will depart the train.

Andy: I did do that.

David Martel: Flight attendants do that too; I asked for assistance on a recent flight. You might hate doing that if you’re disabled—we’re all proud people—but we must do that.

Jack: Self-designation certainly helps. Safety, plus it helps them get to where they need to go.

David Tracht: The conductors must help too.

Andy: Blind people who get the ambition to travel, can get that ambition lost very quickly when they have a problem.

David Tracht: The train put me to sleep on the way home and I always woke up before my stop. I always wondered what if I didn’t? Partially-sighted people have particular problems in the fall and winter.

Jack: I ran into a new system today. They have automatic stop announcements that you may have heard in the subway (“Next stop...Government Center"). There is now a system on the commuter rail—but it has a female voice, which I don’t like.

Those who get a Blind Access Pass for the T: It's no longer good forever. It needs to be renewed every five years.

Renewal reminders aren't sent automatically.

Charlie: A blind person or a sight-impaired person can’t possibly read the fine print on the pass! What is he/she supposed to do?

Jack: I called the T to get a new one. They said they’re backed up. What do I do in the meantime? The phone rep told me something interesting: “Try the pass and maybe they’ll let you on!”

David Tracht: Won’t work on commuter rail.

David Moisan: I remind people that about five years ago, the T went to their Charlie Card system. They may be hoping people will fall off the rolls because they are deceased or they are no longer impaired.

David Martel: Where can you reload a Charlie Card in Salem?

David Moisan: Register the CharlieCard online. If you’re comfortable using debit online, this is best. All the buses have fare boxes that can be used to reload cards.

Most drivers are patient. Or you can go on the bus a few minutes before the trip. There are a few extra steps that involve tapping a button, tapping your card, inserting your money, tapping the card again and finally tapping the card one last time to pay the fare.

Jack: One of the drivers will help if you ask.

MAAB Update--4 First Street

4 First St. will get a site visit from the MAAB to review the parking lot access problem. We were hoping to do it this week but things came up. We’ll let everyone know when this is happening.

Variance at Morency Manor, Salem Housing Authority

Jack: The Salem Housing Authority asked for a variance. I handed this to David Martel and David Tracht since it would be a conflict of interest for me (and David Moisan) to handle it since I (and Dave M.) are SHA tenants.

David Martel: SHA wants a variance for Morency Manor. The control panel for the new elevator is in an alcove, but they want to put in a 2nd control panel. There should have been a variance in the first place from the contractor.

Variance at 76 Lafayette Street

Jack: Taco restaurant has been proposed for the unrented part of West Coast Video. The variance was requested before the building was even permitted, which we really appreciate. We will make a recommendation and send it along

Burba Dental (Highland Ave. @ Wilson Rd.) Variance

Jack: There are no HP parking spaces and ramp is not compliant. Tom St. Pierre will be back and we will discuss this. We want to know why the ramp is not compliant. I will let people know what’s going on.

Jack: The SRA had a meeting about outdoor seating. I talked about the direct path of travel. There was a problem involving the old Edgewater Café. They had seating that blocked off the sidewalk and got two complaints about it.

We will have to revisit this.

Dave Martel: Tavern in the Square: They flattened the traffic island and relocated the traffic controls. They did a very nice job and there are no access issues or trip hazards. They did listen.

Jack: We will have to watch this; summer will wind up quickly.

New Business

ADA Observance July 26, 2010

Jack: This year is the 20th anniversary of the ADA. I would like to put together some sort of good observance. The ILCNSCA is putting on an event. I'd like to have an event here, at Winter Island or Old Town Hall or the Ferry.

There are many accessible areas that are new in Salem that we should or want to highlight.

David Martel: Access training again?

Jack: Jeff Dugan is trying to visit every Commission on Disabilities in the state (200?). And is asking for an invitation (we will invite.) Regional meetings have happened, and the Disability Consortium Council has been doing some of these meetings.

Debra: Regional meeting in Salem?

David Martel: It’s possible. Visitor's Center is one possibility.

Dave Martel: For people starting up or reactivating their Commissions, Salem is an excellent model.

Incident on Bridge Street

Jack: There was a small article in the paper last weekend. A young lady in a chair was trying to get up Bridge St. near the motel with the MassHighway construction. A truck was parked on the sidewalk in the way, so she went around and the flagman on duty was very upset with her. Not that it’s necessarily the flagman’s fault, but the pedestrian should have gotten assistance. I brought it to the attention of John Jodoin about this.

Charlie Reardon: I talked about this with the construction crew on Bridge St. The flagmen don’t want to work on Bridge St. Officers will work Bridge St. while the [civilian] flagmen will do side streets.

Jack: My interest in this is that the flagman was obviously unhelpful. The truck should not have been parked there.

David Martel: It brings up a thought about school crossing guards. I wanted to cross the street at Boston & Essex Sts. and there was a crossing guard. I asked the guard for help crossing, and he told me I wasn’t a kid. Well, I’m not a senior citizen but still the traffic is horrendous.

Jack: Is the crossing guard solely for children? There needs to be clarification one way or the other.

David Moisan: I have had the opposite—crossing guards who insisted I cross the street with their assistance.

A Frame Signs, City Council Committee Meeting

Jack: Regulations for A-frame signs are being reconsidered. Joan Lovely is heading the committee to govern over these. We have asked for an invitation to a meeting. These signs directly impact the path of travel.

Andy: Nothing specific in the ordinances about disabled or blind, only the general 36 inch rule. If there needs to be consideration for the disabled with those signs, we need to speak out.

Charlie: I suggested to Rinus [Salem Chamber of Commerce] that the red line at Daniel Low's (now Rockefeller's) be cleared of any signs, seating and etc. and make a clear path of travel. This was done last year and all but 2 merchants complied. Signs should be near a tree, pole or other landmark when possible instead of standing on their own.

Andy & Dave Martel: Suggested a map similar to the official visitor's map, but instead of the usual red line, a blue line detailing path of travel and accessible pedestrian signals. A woman from Winthrop told me she has no idea how to safely get from one point of interest to another in her wheelchair.

Dave Martel has volunteered to do this.

Andy: Salem is a great place to visit for people with disabilities. Just go to any place where people from around the state meet, like the Carroll Center for the Blind. They all say Salem is great!

Jean Harrison: Put a sign outside designated restaurants?

Charlie Reardon: I’ll make the sign. It’ll have the HP logo and “courtesy of the Salem Commission on Disabilities” (blue and white).

Dave Martel: The information is sent also to Shaugnessy for use by the patients and families.

Other Business

Independent Living Center of the North Shore and Cape Ann—911 Indicator Form

Andy: The ILCNSCA had no idea about the 911 indicator form; they are aware now, but for now we need to remind every disabled person in Salem to fill out the 911 indicator form in case of emergencies. All information is confidential.

Jack: 911 Indicator form has been on our website for some time. They just have to call us or attend our meetings. They have not. They've refused to work with us. They haven't even asked us to be part of variance requests. They know we're part of the process and they just don't want to do it.

Andy: If they don't know about it and I didn't know about the ILCNSCA, what's more important is that some disabled person needs to call 911 and it's a crisis--the person won't be thinking of that. Point is, when they fill out the form and something goes wrong, they will know the situation, you're in a wheelchair, you need rescue, etc. We need to bring it to everyone's attention. 25% of Salem's population has a disability. (!)

We need to get the point out.

David Martel: Can put out a flyer?

Andy: We need to work on this continually, and never stop.

Debra: Send the forms to the ILCNSCA?

Andy: I do my show for TIC and send the information everywhere.

Jack: The ILCNSCA gets this?

Andy: Not unless they listen. It's important enough that we need to make this a priority.

Audible Signal at Market Basket Southbound

David Moisan: The audible signal at the bus shelter outside Pep Boys (Market Basket southbound) broke several weeks ago. I notified Jason. The Polara signal was replaced two weeks later with a non-audible button. Need to check back with city engineer to see if audible signal will be replaced. The crosswalk needs audible signals at both sides for them to be effective.

David Martel: I’m surprised there are no audible signals at Salem Hospital. The sun obstructs view at sunrise and sunset.

David Moisan: There are no new signals north of Salem High--all signals between Essex St. and Wilson St. are the old non-audible signals.

Jack: Since you started this query, can you follow up with Jason?

David Moisan: Yes, I will check on that one. And I will ask about what will happen north of the high school. Boston St. is another issue entirely, but my immediate concern is the Market Basket signal.

Adjournment

Next Meeting is May 18, 2010,

Guest will be Verizon [Tom Boudreau]

Thursday, February 25, 2010

Salem Depot Design Hits 30 (Percent)

Conception of garage with city-developed structure at left

The MBTA held its meeting on the 30% Design Phase of the Salem Depot project last Tuesday night.

I wouldn’t characterize the opinions as “mixed”;  there were a lot of helpful suggestions and not a lot of ranting as one can often hear at other public meetings.  I thought Bill Luster’s comment was very thoughtful,

Bill Luster, a former Salem city planner, reminded MBTA officials to heed a local mantra — "in Salem, design matters." He suggested they put as much brick and granite on the garage as possible.

But for the most part, the particular appearance details are not my dog in the fight.  This is what I thought was important, and what I will send to the MBTA, the mayor’s office and my chairman of the Disabilities Commission:

First, I was gratified and surprised to hear that the T decided on the full-height platform option.  Last I’d heard, a half-full-height, half-ground-level platform was being proposed in the original design documents. 

A full-height platform is the right thing to do for a busy station like ours. 

Second, I am focused on the Bridge St. pedestrian entrance like a hawk.  I use this entrance nearly every day.  I was hoping for more details on the construction of this important vehicle ramp and pedestrian entryway.

I realize some still want a footbridge or a tunnel in that area.  I’ve been in and around Boston’s numerous footbridges, enough to know that one cannot put in such a bridge without changing the local pedestrian environment dramatically.  Many footbridges (the one over Huntington Ave. to Copley Place, for example) further isolate pedestrians and make their immediate area unfriendly.  So I wouldn’t advocate for this—it may well make things worse.

I also remind the T that the waiting area is still an important part of the project that many of the riders will be close to every day, whether they mean to or not.

The current canopies, which are not continuous, should be torn down and replaced with a continuous canopy. 

As well, recall what I’ve said before about electronic signage:  We must see an electronic, easily read and continually updated train display.  I also note that the T has started a pilot project to provide next-bus information.  One hopes that by 2011, it will be expanded to include Salem’s service area.

The MBTA heard our comments, also, about security and safety.  These are ever important, not only for people with disabilities but for all those who use the station at any hour of the day.

Lastly, I’m responding to some at the meeting who don’t want the proposed ramp, who are concerned about “walking further than they have to.”

I can understand being at the top of the steps to a train station and seeing your train leave.  It’s happened before and will again.

However, Salem would not be unique in this.  There are many stations in the T system that require a long walk to the exit, or to another train, depending on the location.  On the Red Line, South Station and Downtown Crossing are notorious mazes, particularly to and from the Silver Line.  On the Blue Line, if your car is parked west of the Wonderland platform, you need to go up and down stairs, quite a few of them, before you can even hit the turnstiles to leave.  So don’t think Salem is put upon in particular.

I absolutely hate the current stairs.  I fell down them once, and while physically long since recovered, have never stopped my hate for them in the least.  There is no way I would tolerate a design that had me go down the existing stairs and across a roadway at ground level before I got to my bus stop.  No.

Some at the meeting, and in the filed comments talked about the “few disabled people” who use and need a ramp compared to the “many”.  This isn’t the most fair comparison.

A station like Salem’s is used by many people, big surprise there.  But it is also used by visitors.  Many visitors with disabilities have told us at the Commission on Disabilities how easily they were able to get around and how much they enjoyed their time in the city.  About 20% of Salem residents have a disability—1 in 5 of us.  We don’t know how many of these are mobility impaired, but we do know it is more than a mere “few”.

Accessibility on the T only works well when all the stations are accessible.  Many disabled people travel to Salem with friends and family.  If a disabled person has problems at Salem, he or she likely won’t come back—and nor will their friends!  In a tourist-centered city like ours, that’s been unacceptable for quite some time.

I’m encouraged by the progress so far and we’re looking forward to the next phase.

Comments are being accepted through March 5th.  The comment deadline is this Friday, March 12th.

Contact Tom Rovero, MBTA Design and Construction, 500 The Arborway, Jamaica Plain, MA 02130

or Karen Despirito, Senior Community Affairs Coordinator, (617)-222-6513

kdespirito@mbta.com

Thursday, February 18, 2010

MBTA Meeting on Salem Depot

MBTA garage from Washington St.

First, I want to apologize for not blogging much recently.  I’ve had a big computer project at SATV that we just finished.  The Commission hasn’t met since December—our February meeting this past Tuesday was cancelled due to the weather, which was at its worst at 4 PM when we meet.

And I’ve been burned out:  Politics have been very unpleasant recently;  there’s an ugly undertone to civic affairs these days.  And that doesn’t make blogging fun.

The MBTA will hold another public meeting on Salem Depot next Tuesday the 23rd, at the Carlton School.  As promised last fall, this meeting is called at the 30% design point.  The full plans are on the MBTA web site.  Here is the current site plan:

Salem Depot Site

I note that the covered pedestrian walkway that was in the original plans is not seen in this revision.  Pedestrian access from Bridge St. is critical to this project since it will serve the new courthouse complex as well.  I also note the architects went with Option 1 for the busway;  I would have much preferred the busway be closer to Bridge St.  So much for that.

I’ve recommended that the Commission on Disabilities take these points to the meeting:

  1. We must have a full-height platform for the whole length of the platform;  the T has favored a half-full-height/half-low platform.
  2. The plans show partial canopies over the platforms, much like the existing station.  There should be a full canopy over the entire platform.
  3. There must be good pedestrian access from Bridge St.  There is going to be a vehicular entrance ramp where the current stairs are now, and features like the ramp can be pedestrian-hostile.

It’s important, though, to keep this project in perspective.  We’ve needed a garage and added parking at Salem Depot from the day it opened over 20 years ago.  I’ve hated the appearance of the station, the platform at the end of nowhere, and most of all the stairs.

Some people in Salem want the perfect.  John Ronan, the newly-elected Ward 5 councilor, filed some good comments that I quote in part:

First, I’m glad this project is funded and going forward. The station is in true need of additional
parking. Salem is extremely fortunate not only to have a train stop but to have one in the
downtown area walking-distance from many of our shops, offices and attractions.
Often, Salem planning issues get bogged down in search for a fanciful perfect solution. I saw
seeds of this taking root in the statements of a few attendees advocating a mixed use or an air-rights platform in lieu of a garage. Without any commitments or even any prospects for the private development aspect of such mixed uses, they simply aren’t viable. Even if the City agreed (as would be necessary) to couple its lot with the MBTA lot it may never find
a developer willing to build on top of an air rights-platform on conditions favorable to the City. All these components certainly would not come together by the December 31, 2011 deadline.
Therefore, I believe Salem is correctly positioning itself for the future by keeping its crescent
shaped lot separate from the MBTA lot. The garage project should proceed as a garage project.

If the idea of an air-rights project had been proposed in the early 2000’s, I would have supported it.  Unfortunately, projects like that are subject to the vagaries of funding.  We can ask the Columbus Place developers how well that is going. As it is, until the governor gave a commitment to Salem Depot, the project would have been a dream project, 5 or 10 years in the future.  And it always would have been.

Because of the land situation, the MBTA probably won’t get to resolve all of the issues that were brought up at the earlier meeting.  In particular, pedestrian access from North Street is a difficult and ugly problem that I fear won’t get resolved.

This is probably the best we’re going to get.  The three points I outlined are the most important.  If they can be resolved to my satisfaction, I’ll be happy with the result.  As will most Salemmites.

Tom Rovero is the MBTA contact person for this project and he can be emailed at trovero@mbta.com.  

Saturday, January 9, 2010

Stranding Seniors

MBTA Ride Van

I’ve written before about transportation for seniors and the disabled.  Another story came out over the holidays.

The Globe profiles one Marblehead resident:

It’s the spur-of-the-moment trips that June Casler misses most, the spontaneous decision to catch a 7 p.m. movie or to pick up a coveted book at the library. The octogenarian hung up her car keys for good when she moved from western New York to Marblehead in June because she felt that negotiating busy, unfamiliar streets could be distracting and dangerous.

Casler has since discovered that the local Council on Aging van doesn’t run nights or weekends and requires 24-hour advance notice. She doesn’t want to burden her son and daughter-in-law, who live nearby, for rides during the van’s off hours. But neither does she want to end up like one of her 90-year-old friends who could barely see but was still behind the wheel - until her family called police to intercede.

We have been heading for a collision for some time.  We’ve built our society around the car and deemphasized other options so that the car and its needs have become a massive hidden subsidy imposed on cities, towns and the state.

At the same time, the cohort of seniors that remember life without easy transport—the car life—is dwindling.  My late mom remembers streetcars, trains, walking, buses and even horses.  Seniors today and those soon-to-be-seniors have few such memories and baby boomers have none:  They have always enjoyed life with the car.

I wonder, as well, if the “nuclear family” philosophy of the boomers has contributed.  I heard any number of stories in high school of students reaching 18 and their parents showing them the door, politely or not. 

How can one square this with the sentiment I’ve also heard over and over, that “your kids owe you” to look after you in your old age?  Many adult children are scattered across the country, since mobility is valued, preferred and even necessary for some.

There will be another attack of outrage when a senior is involved in a traffic accident, but I fear we’re not going to do much.  Easy to be mad at some poor 80-year old that runs down a kid, but hard to admit that your city’s development philosophy is flawed or that we’ve been trying to segregate our seniors for 50 years and it doesn’t work. 

Real resolution of this would be expensive.  So we won’t see progress.

Truthfully, seniors have every incentive to dodge the eye doctor and drive no matter what.  It’s the only way they’re really independent.

Ms. Casler took the high road;  I just wonder if she’s regretting it.

Monday, November 2, 2009

Double Decker Rail Cars Visit Salem

Courtesy John Arico, this is a video of double-decker K cars that ran on the north side (us) to Salem this year.  They can indeed run through the tunnel, check it out around 3 minutes into the video.

Check out this thread on Railroad.net.

Now, if we can have these for the 7:25…

Sunday, October 18, 2009

Day in the life of the T

Good video on many of the modes of the T. I've taken them all except for the Mattapan trolley and the commuter boat, though I have taken the Salem Ferry a few times.

Thursday, October 15, 2009

Comments on the Salem Depot Project

Model of proposed Salem Depot garage

These are comments I’ve sent to Thomas Rovero of the MBTA, and the mayor’s office on the proposed Salem Depot garage. There will be another public meeting sometime in December.

From: David Moisan, Salem Commission on Disabilities

To Thomas Rovero, MBTA, Mayor Kim Driscoll, chief-of-staff Jason Silva:

Dear Mr. Rovero, Mrs. Driscoll, Mr. Silva:

I’ve attended the public design meeting on the new Salem Depot garage and have read the report posted on the MBTA web site. I believe it is a good starting point and a very welcome development.

There are, though, some concerns I have with the design. The word that comes most to mind is isolation. There are elements of the design that serve to cut off train and bus riders from downtown.

First, I’ll grant that a good part of the isolation comes from the original design of the traffic rotary on Bridge St., and the original use of the Salem Depot area as a maintenance area, interlocking tower and track junction by the old Boston and Maine railroad. It had been occupied for this purpose by the B&M for many, many years.

At one point in the past, the pedestrian passage to Salem Depot (when it moved to Bridge St.) was fenced off from traffic. But it was still a very dangerous place to walk, and very unfriendly in any event. Not what we want to represent Salem to train travelers.

Any design would have to work hard to overcome these problems.

But some things that were proposed at the meeting just accentuate this isolation.

The existing train platform, and the proposed half-full height platform is one example. Wheelchair or cane users, and on the weekends, all users, must go to the very end of the platform.

From the end of that platform looking north, you can see the Carlton School on Bridge St., a full mile away.

It actually seems closer to the platform than downtown!

I remember when the depot moved to Bridge St., trains stopped much closer to the tunnel portal. A few years later due to ADA requirements, the mini-high was built and trains moved further up north.

I support the ADA. The ADA is not the problem. But I didn’t like and still don’t like going what seems like miles from the Bridge St. entrance to get a train.

I’ve read the report on the train platform. I understand the great difficulties involved in making a high-level curved platform accessible. But I must agree with my chairman on the Commission on Disabilities, Jack Harris, and push as hard as I can for a full height platform that can be reached a short distance from the garage.

My second point is the bus berths. I ride buses from Salem Depot frequently. For I and many other people downtown, Salem Depot is the closest place to get a departing bus, since most of the bus routes skirt downtown when they leave the station and there are no closer stops.

The preferred design alternative has the bus berths on the north side of the station, with the garage between the buses and the Bridge St. entrance.

As with the train platforms, this is almost as far as Carlton School! Perhaps when I need to take the 456 I should just walk up Bridge St. to the school.

I much prefer having the bus berths along one side of the garage, or even two, as it is in one alternative presented in the report.

And they must be sheltered or at least have canopies like the current bus shelters. Some bus routes run at 80 minute or even 90 minute headways so riders will want to use the train’s waiting room; in dead of winter with kids in tow they’ll need to.

On the waiting area, I want to see it on the platform side of the station, in sight of both the train tracks and the bus berths. People will have an eye out for their train or their bus.

There must be digital signage, and automated announcements. I’m aware the T is phasing in a new generation system; Salem must have it. We must be able to sit in the waiting area and hear , and see “The next train to…Newburyport…is now approaching”, similar to rapid transit announcements. Within the lifespan of the garage, there’ll be a similar technology for bus passengers so they’ll know how long until the next 455 comes. The design of the station must allow for these improvements.

My last comment is for the City of Salem.

As all of us know, the Courthouse project, and many other projects, are changing downtown.

The city is starting at a disadvantage; as noted in my opening paragraphs, the area of Bridge and Washington Sts. has never been made for pedestrians. Visitors, jurors and court personnel alike will use that intersection constantly.

The City must do what MassHighway has done for the recent Highland Ave. crossing reconstruction and put modern audible talking pedestrian signals at Bridge and Washington.

There’ll probably never be a footbridge or a tunnel in that area in my lifetime; neither are practical.

The city, and the MBTA will have to work very hard in the coming months to make this version of Salem Depot welcoming to commuters and visitors. They need to make Salem Depot part of Salem’s downtown once again, as it hasn’t been for over 50 years.

The design is a very good start. I’m looking forward to future meetings to make this the best it can be. I’ll probably be one of the first to go down the ramp into the new station when it opens.

Make me proud of it, and proud of my city.

Sunday, October 4, 2009

First Thoughts on the MBTA Garage Proposal

Conceptual rendering of Salem Depot

As I mentioned in my last post, the MBTA has released design plans for the new Salem Depot.

Quoting the executive summary, these are the goals and highlights:

The intermodal center design will include 750-900 garage parking spaces, five bus
berths for MBTA buses, drop-off / pick-up parking spaces, taxi parking spaces, covered
storage, enclosed waiting, elevators, and an accessible ramp. The height and massing
of proposed structure will respect the historic context of Salem downtown. Exterior
building materials are anticipated to include masonry and brick in keeping with site
context and existing municipal buildings. All facilities will be designed to meet code
requirements and accessibility guidelines.
Four design options were developed to address the functional needs of Salem Station.


All options include the following features:
Six total parking levels (includes ground and roof levels)
Lower building height on Bridge Street side (4 stories at 44 feet tall)
Median building height on North River side (6 stories at 66 feet tall)
Clear pedestrian connection from Bridge Street to train platform via raised plaza
Additional vehicle ingress/egress from Washington/Bridge Street intersection
Higher grade level floor-to-ceiling height for buses and more natural light
Improved and direct handicapped access to train platform via covered ramp
Safer pedestrian access via dedicated sidewalks on city and river sides
Straight façade on Bridge Street side respects urban character of street
Scalloped façade on North River side breaks up building mass
Express ramps at center of building allow for safe and fast vertical circulation.

I believe the design is a good start.  We have not yet seen any drawings or conceptual views in the context of the existing parking lot, but it appears that the garage won’t impact on the North River vista, at least not any more than the other projects in the area, such as the court complex.

Many people, myself included, had the idea that the garage structure would be built right up to the ramp fronting Bridge St.  In fact, the Commission on Disabilities had debated this point a few years ago, during the first abortive attempt at a new depot design during the Usovicz administration.

Several commissioners had hoped that there would be direct access to the street from the parking garage.  Unfortunately (or fortunately) this isn’t going to be:  Salem owns and will continue to own the crescent of parking spaces just inside the entrance to the station.

Salem Depot Sections of Ownership

So, there will be a pedestrian ramp from Bridge St. to the 2nd level of the new garage, which will pass over the traffic lanes at ground level.  The ramp can be seen in the opening illustration, in several variations;  some open, some enclosed.

Salem has very few enclosed ramps, and those all connect buildings:  The Salem State College Library to Meier Hall (soon to be demolished), the ramp that connects the Davenport building at North Shore Medical Center to Shaugnessy Rehab, and the newest ramp that connects One Salem Green (now owned by Salem Five) to Salem Five’s main building.

This will be the longest ramp of its kind in Salem and the first to pass over a roadway.  Visitors to Boston’s Back Bay may recall the walkway that connects the Prudential to Copley Place over Huntington Ave.  That walkway is not a favorite of many architectural critics.  Unfortunately, the siting of the garage doesn’t leave many options.

There will be a car entrance next to the current pedestrian entrance on Bridge St.  I’m not certain how well that’s going to work out, particularly for courthouse-bound walkers.

I’m particularly concerned about access to the bus terminal portion, since I use that mode very frequently.  This is Option 1:

Salem Depot Ground level option 1

The bus platform is quite a long ways from the street.  In general I’d like not to have to walk so far to the bus.  On those days that I’ve taken the train in to Boston, I’ve stood on the platform at the very end of the station and wondered out loud if it would be quicker to walk to the Carlton School (visible from the platform!!) to get the train.

I like Option 2A just a bit better:

salem depot ground level option 2A

The bus bays appear a little closer to Bridge St.  Keep in mind, though, that only five of the bays are “live” and take passengers;  the other two are layover berths.

The differences in the other options pertain to where the taxi stand and the kiss-and-ride areas are located;  I have no opinion on those.

On the train platform itself, three options have been presented.  Currently, it is a low-level platform with a mini-high platform at the very end of the track (within sight of Carlton School!)  That is one option.  Another option would be to make the entire platform high-level (as at Newburyport and Central Square) but there is a curve in the track that makes it difficult to get ADA compliance.  The last and preferred option is to make the northern half of the platform high-level and the southern half near Bridge St. low-level as it is now.

There are more considerations that will probably be addressed at the meeting.  Another quote from the executive summary:

The design team will provide precedents for proposed parking facility to further the
development of exterior treatments, planning, operational efficiencies, and architectural
design. Please see Review Draft Memorandum dated 16 August 2009 attached in
Appendix 10.6 for further design discussion from the City of Salem. Planning items to be
further reviewed and developed include:
Security for underside of bridge entering second level of proposed parking facility
Pedestrian access from Federal Street and North Salem neighborhoods
Lobby area for waiting with amenities such as coffee and newspaper vendors
Covered bus loading area
Operational efficiencies to be resolved include:
Pedestrian circulation within garage
Decision for entry/exit to be attended or automated
Determining appropriate number of entry and exit lanes
Improve efficiency in parking layout
On site vehicular, bus, and “kiss and ride” circulation

The City (or at least the mayor) wants an enclosed, heated waiting area.  I’d suggest security for the ramp itself be considered, particularly if it is enclosed.

Construction would be completed in December 2011, two years from now, assuming it takes eight to ten months to complete the environmental permitting. 

This also very much assumes the City and state can go forward without any delays.  

We’ll see this Tuesday.

Wednesday, September 30, 2009

Salem Depot Design Plans Posted

Salem Depot parking lot, nearly full at 7:30 AM

The MBTA has released its design plans for Salem Depot.  I haven’t looked at them yet.

There will be a public meeting on the design next Tuesday, October 6th, 7 PM at the Carlton School.  I plan to be there.

Wednesday, August 12, 2009

MBTA Hearing in Salem Cancelled

455W at North St

Next Monday’s “public workshop” in Salem has been cancelled by the governor, following the dismissal of MBTA GM, Dan Grabauskas.   Quote from John Keenan’s email yesterday:

Today Secretary of Transportation James Aloisi suspended the remaining hearings on the proposed MBTA fare increase, including the August 17th hearing scheduled in Salem. 
The Patrick Administration has indicated that there are no plans to move forward on the proposed fare increase until a review of the MBTA's finances is completed.  The review is due by November 1st.

The first “workshop” was already held in Boston, and it was contentious, as I expected.  Some interesting excerpts:

Representative Carl Sciortino, a Somerville Democrat who said he takes the T every day, said the inner politics over Grabauskas’s removal has diverted from the more far-reaching impacts of the proposed fare increase.

“We think the finger-pointing is actually a distraction from the real issue facing the MBTA and its financial health,’’ he said. “We’re looking to move beyond the finger-pointing and get back to the MBTA riders.’’

Hats off to Mr. Sciortino.  He’s one of the few pols who takes the T regularly.  Our own rep, John Keenan, takes the commuter rail, but not sure if he does it every day.

At the start of the meeting, interim MBTA General Manager William Mitchell sat at the front of the auditorium, though after a barrage of critical comments from lawmakers, he moved to the wings of the building. [my emphasis]

Granted, Mr. Mitchell doesn’t go to public meetings every day, but it’s his job in the interim to handle difficult things, including questions.

I agree the fighting over MBTA management and the fare hike is a serious distraction to the future of the agency and public transit in Boston, but Mitchell, and Grabauskas have demonstrated why they were both unsuitable managers.

Dan had an easier time at the Registry of Motor Vehicles.  He was a driver, as is the vast majority of citizens in Massachusetts.  All of them (including myself at one point) have been in an RMV office at some point, at multiple points, in their lives.

Dan didn’t take the T.  He lived in Ipswich, but far away from the rail stop.  From what I’ve heard, many of his managers didn’t.

If a T manager had to, for example, go through Kenmore station for years at a time while it endured years of construction.  If he or she had to answer questions from people on the platform as to why it was in the state it was in for years, why it was never finished, and had to do that every day, there would be action and speed.

Closer to home, Dan had never, so far as I know, stood waiting for a train at Salem Depot.

The editorial board of the Salem News is not happy with Dan’s dismissal.  He’s a Republican, he’s in Ipswich, and he’s a Nice Guy (the all-purpose compliment to cronies.)

Not good enough.  I expected better.

No word yet on the service cuts.  This isn’t over.

Monday, July 20, 2009

Transit for the Disabled Endangered by Cuts

Salem Council On Aging 2009-07-20 016

The Salem News has finally caught on to the service cuts the MBTA proposed a few weeks ago.   This time, they’re focusing on cuts to The RIDE, the T’s paratransit service for people with disabilities.

The T would eliminate van service in Peabody, Beverly, Danvers, Wenham, Topsfield and Middleton.

This affects service to these communities, as well as from, so disabled riders in Salem aren’t in the clear.  Especially since Danvers and Peabody are big shopping, employment and medical areas.

One woman in Beverly is already affected by lack of van service.  Lois Gallo is a clinical social worker at Cummings Center.   She has The RIDE in Beverly, but wants to move to Ipswich.  Ipswich, as the result of a decision made years ago, is not in the MBTA system but is served by CATA (Cape Ann Transportation Authority).  CATA does not run van service to Ipswich.

I would note that under the proposed cuts, Ms. Gallo would not have van service at all.

Without the MBTA to run vans, service would either come from chair car services, which are very expensive for individuals, or from communities that run their own service for the elderly, as Salem, Peabody and surrounding communities do.

Governing Magazine recently ran an article, “The Costliest Ride” about paratransit services.

In Sioux Falls, South Dakota, a city of just over 150,000 people, almost half of the annual public transit budget doesn’t go for buses, or trolleys, or any newfangled light-rail system. It goes for vans—to provide mobility to disabled people who can’t use the regular vehicles. These riders receive curbside service outside their homes, and are dropped off at their destination of choice, at a cost to Sioux Falls of $25.61 per trip. Every sizable city has some version of this program. It’s called paratransit.

And it’s a piece of the public transportation puzzle that’s often forgotten—by everyone except transit agencies and those who depend on the service. The agencies can’t ignore paratransit because they’re legally obliged to provide it under the federal Americans with Disabilities Act. But it’s hugely expensive. Sioux Falls’ cost per trip is actually lower than most—a one-way ride for a single disabled person costs more than $30 in many places. While most big cities don’t spend as much proportionately as Sioux Falls, it’s common for a transit agency to devote 10 percent or more of its operating budget to paratransit. And the fares normally cover less than 10 percent of the costs.

It’s a necessary service, but a very expensive one for cities and towns to provide.  This is why I’ve been so insistent that our new senior center be on a bus line and accessible to public transit, whether was at the old St. Joseph’s Church or at the Boston St. site.  Despite our best intentions, it’s an expensive service.  When I went to the Council on Aging earlier this afternoon to take the picture that leads this blog, all five of their vans were parked.  I can only assume we can’t afford to keep them moving at all times, what with drivers, gas and the many other expenses that come with a vehicle fleet.

If the MBTA takes themselves out of the picture due to budget cuts, the cities and towns could not possibly pick up the slack, and our vans won’t be running any more often than they do now..

Saturday, June 20, 2009

MBTA schedule changes for routes 450, 456 and 455

MBTA Bus Sign 2009-06-20  (5)

The MBTA has announced schedule changes for Salem bus routes effective Monday. These changes were first put forth by the MBTA last winter and they affect route 450 and 456 significantly during the weekdays.

Route 456: This route will now run every 80 minutes (1 hour and 20 minutes) instead of every 60 minutes. Buses leave Salem at 9:40 AM, 11:00 AM, and every hour and 20 minutes until the last bus for Lynn at 4:20 PM.

From Central Square, the first 456 leaves West Lynn at 7:00 AM and 8:30 AM (rush-hour service), and starts its regular service at 9:00 AM, 10:20 AM and every 80 minutes until the last bus for Salem at 3:35 PM.

Route 450: Weekday service outside rush hour (9 AM to 4 PM) runs to and from Haymarket at 60 to 80 minute intervals, leaving Salem at 9:10 AM, 10:20 AM, 11:40 AM, 1:00 PM, 2:20 PM and 3:40 PM. Buses from Haymarket run at 9:10 AM, 10:20 AM, 12:00 Noon, 1:00 PM, 2:20 PM and 3:10 PM.

Route 455: Quoting the T:

The 5:19 AM outbound trip leaving West Lynn for Salem Depot will now leave at 5:16 AM.
A new trip will leave Salem Depot for West Lynn on Route 455 at 7:00 PM.

No changes to weekend service on the 450 and 455 (456 is a weekday-only route.)

The biggest changes are to the 456, a route I take most often. The T cites congestion on Western Ave. and 107. It’s true that over the past 20 years, Rt. 107 between Salem and Lynn has gotten more and more congested—the recession hasn’t changed it a bit! When the T cites “schedule adjustments”, they’re really saying they can’t keep to the schedule, or more importantly, they can’t afford to run extra buses to maintain it.

The 456 in particular gets quite a lot of use by Lynn residents who shop on Highland Ave. and use North Shore Medical Center.

As I write this the T is contemplating a 20% fare hike and service cutbacks. There’s been no news at all, despite the much heralded transportation bill before the Governor.

MBTA bus schedules are revised every quarter; the next revision will be in September. If the ax falls on MBTA service in Salem, it’ll happen in December, the next quarter after that. I’ll be watching.

Thursday, February 5, 2009

Salem Depot Garage inches forward

The state has released money for design of a new Salem Depot.  New figure for the garage and depot is $46 million; one commenter on the Salem News wonders why it’s so high.  It is a lot of money that would have been better off spent sooner.  I suggest charging the amount to those people who held up this for years until more “studies” could be done.  If  a neighborhood association knew it could be liable for unwarranted delays, it might be more careful in judging just how its positions might affect other neighborhoods and the city as a whole.

No more studies.  Just build it.  Mayor Driscoll thinks the same.

Another commenter asks why we don’t have double-decker trains, which are desperately needed on the Rockport line (try finding a seat on the 7:25).   The MBTA has let out a contract to buy double-deckers from a Korean firm.    Here’s a image—presumably an artist’s conception—from eDaily, Korea:

There’s been a lot of concern about the build quality of these trains, but it’s a done deal.  I’ve heard, though, that these trains will have electronic signs and automatic stop announcements, like on the Blue Line.  At a station like Salem where any given train can go to one of three places on the same track, this will be helpful.

Now, if the T could just get some new locomotives…

Wednesday, February 4, 2009

Walking in Salem in the Winter

The Salem News followed up on my earlier blog post, The Most Dangerous Bus Stop in Salem;  Tom Dalton’s article, “Worst Bus Stop in Salem?” touched on most of the points I made.  The Mayor’s office is looking at a few things they can do;  one thing they can’t do, according to the MBTA, is put a bus shelter there.  As I’ve suspected, there is no room on that sidewalk.

The solutions available are to reroute the 450 and 456 buses to go through the parking lot to Market Basket, as Market Basket has asked for, or simply to plow the sidewalk. 

My colleagues and I in the Salem Commission on Disabilities all agree that we should not let this drop when the last snow melts this season.  There are numerous other places on Highland Ave. that are problems for pedestrians, such as at Wal-Mart ,and the inbound lane across from CVS on Essex St. and we need to look at them all.

I’m glad, of course, that Tom Dalton put a spotlight on this issue, and the Commission, but I must move on to other problems. 

One glaring problem all winter has been the sidewalk at the one-hour lot outside Museum Place, seen in the photo  above.  Except for a brief period in December when the snow melted, it has been impassable all winter.  St. John’s Church does not clear its sidewalk on the opposite side, and the street itself is very narrow.

It’s no less dangerous than Highland Ave. to a pedestrian in the winter.  And it is the route I take to SATV every day.

Lastly, here is a photo that illustrates what the Commission has to contend with in the winter:

This was taken on Sunday morning outside the Zisson elderly housing complex at the Salem YMCA [and the space belongs to the SHA, not the Y—correction.]  Note the high snowbanks, that would make it difficult for those in a chair van to navigate.

Also note the parked car (I’ve obscured the plate.)  Current HP placards are hung from the rear-view mirror;  I didn’t see one. 

My colleague Dave Martel has been after the Y to shovel its HP spaces;   he’s a reader of my blog, I wonder what he’ll find?

Update:  I’ve heard from Dave;  the city or its plowing contractor at the Y is doing a better job this year.  We may yet get through the rest of this winter without a serious problem.

Monday, January 19, 2009

The Most Dangerous Bus Stop in Salem

The winter of 2008-2009 is well underway.  Winter brings me another problem I encounter every week.  Monday morning is for grocery shopping, and I usually do that at one of the stores on Highland Ave.  This is the view I have every winter day I shop there.  Here is the most dangerous bus stop in Salem.

This is Highland Ave. northbound at Market Basket.  It’s not shoveled.  The snowbanks completely cover the sidewalk and extend several feet into the street.  These snowbanks are either too soft to climb, or too hard, almost mountainous.  If you were to climb these snowbanks, as I have done, you would be several feet off the ground.  If you can jump onto the bus without falling, you’re good!

The alternate is to stand in the street, or as I most often do, stand in the street and shuffle backwards into the snowbank as far as possible to give vehicles, and the bus, plenty of room.

The sidewalk is owned by the same entity that owns the Market Basket lot (which may be Market Basket themselves) and I have never seen it dug out in all the years I have shopped in this area.

The southbound side of this intersection does have a bus shelter:

Jerry Ryan, the Ward 4 councilor, is trying to get a bus shelter on the Market Basket side (where I stood to take this picture). 

So far, no one in the area has been hit, but in North Carolina, a woman in a motorized chair was killed on the side of the road on the way back from food shopping.  The bus stop she normally used had been eliminated and she wasn’t eligible for van service.

There is a bill on Governor Patrick’s desk that would allow municipalities, including Salem, to increase fines for failure to remove snow and to not hold property-owners liable for slips and falls if they cleaned the walk in good faith.  No word on this.

Tuesday, November 25, 2008

Mayor, Commuters Support New Salem Depot

The Salem News follows up on yesterday’s petition drive at Salem Depot.  Mayor Driscoll expands on one detail of the project I found interesting:

The mayor has formed a committee to explore a possible public-private partnership and to try to push Salem to the head of the long line of communities hoping for more train parking.

Plans for a new station have changed slightly, the mayor said late yesterday. Officials are now looking at a smaller building that would cost less to build but still provide close to the 1,000 spaces Salem officials want. [emphasis added]  It would be built on a site that would not include city property, the mayor said.

I don’t much care about the specific number of parking spaces, indeed I don’t drive at all so I would not care, except for the great need that the courthouse already poses (for the past 20 years, not just the new facility.)

But I want to see a sheltered platform.  And food service and convenience stores as you find at North Station and Government Center.  Handicapped access that isn’t a rotting ramp.  And the end of those f---ing stairs! 

I want our train station something that’s done right, a rare government project that makes Salem better than it was before it.  A facility that commuters and visitors to our city can be proud of.

We may have budget concerns but we must not compromise on that idea.  We’ve done that too often in the past.

From the comments in the Salem News, it’s apparent that in our cynical state, we can’t or don’t dare to even see that little distance ahead.  To borrow from Deval Patrick, “Together We Can’t.”

Monday, November 24, 2008

Salem Depot Gets Signatures

Salem Depot, long written and complained about in this blog, continues to get attention.  The Salem Partnership had petitioners out to get signatures in support of a new garage at Salem Depot.

Once again, the Salem News comes out to support the project:

If you read this while waiting for the train in Salem Monday morning, you likely encountered the mayor or others bearing petitions seeking support for a new waiting area and garage.

If you read this while waiting for the train, you were also likely freezing. With the wind whipping off the North River, Rep. John Keenan describes the train platform at the Salem depot as "probably the coldest place in North America."

That's a slight exaggeration, of course. But there's no question commuters deserve a more comfortable place in which to wait the arrival of the MBTA's commuter trains than the concrete slab and Plexiglas shelters which serve that purpose now.

Mayor Kim Driscoll, says it's either now or a long time from now for construction of a new parking facility and waiting area at the train station.

We’ve had the current Salem Depot for 21 years.  Early on, there was a very obvious parking shortage.  A few years after, the stairs started coming apart.  I’ve said before, I hate them.

I fully expect, if not for the courthouse project—which has already put demand on parking downtown—that we could wait another 20 years, if ever, for a new station.

I wonder if the NIMBYs will still be here at that time?

The lot’s almost full and it was just 7:30.