Showing posts with label MBTA. Show all posts
Showing posts with label MBTA. Show all posts

Monday, October 17, 2011

My years of futility in Salem transit, part 2

Route 459-Derby St

Following up on my last post, I’m wondering why we just can’t get things done to improve our public transit and make our streets safer for pedestrians and people with disabilities.

I’m signed up with the MBTA to get service alerts for bus routes I regularly use, which would be the 450, 451, 455, 456, 459 and 465.  I just got an alert now:

Routes 455 & 459 are experiencing 15-20 minute delays due to traffic.

10/17/2011 4:07 PM

This has been a regular occurrence.  Normally, I’m not concerned about delays here and there because buses run in traffic and are susceptible to the same delays that affect motorists trying to go down 1A and 107 on their way to and from Salem.

But there’s been a disturbing increase in traffic congestion that has happened in all months at most times of the day in the North Shore.

The MBTA schedules have been severely affected;  looking at Route 456, the frequency of service is now 80 minutes.  That means 1 hour and 20 minutes between buses.  This route once ran hourly when it was established in 2002.  (The 456 is a busy route that serves Central Square by way of Highland Ave., and the many Lynn residents who shop and use the medical offices in Salem.)

The 450 has been affected as well.  In fact, during weekdays, none of the MBTA routes out of Salem Depot run hourly.  The 465 that serves the Peabody-Danvers shopping area runs about every 1 hour and 10 minutes (70 minutes).

Even on weekends, the 455W, Salem to Wonderland, no longer runs hourly, but also slips 5 minutes here and there throughout the day.

This single bus route is the most frequent, and busiest, of all of the MBTA’s Salem routes.  Before the 455 was split into the 455 and 459 routes (the latter going to Logan Airport and South Station on weekdays), it ran every 30 minutes, as does the 455W weekend service to Wonderland.

I have taken that route many times and I can tell you it is crowded.  If you come home from Boston and elect to get off the Blue Line at Revere Beach (one stop short of Wonderland), you will not get a seat on the bus.  (The bus shelter at Revere Beach is much nicer than the one at Wonderland so I board there any time I can.)

Remember also that the MBTA runs many, many other routes to and through Lynn, and to Swampscott and Marblehead.

Here is an exercise for those who doubt this:  Drive down either Route 1A (the Lynnway) or Route 107 (Western Ave.) and pull into a lot somewhere before Revere.  There are a number of Dunks around so pull in with a medium regular and your choice of donut.  Normal business hours are fine, day or evening.

Find an MBTA bus that is marked for service on its LED sign (other than “NOT IN SERVICE” or “NO STOPS”).  Count how many people are onboard;  you don’t need to be exact.

Count the buses and count the people.

You’ll probably find a lot more buses and a lot more riders than you think.  These people are heading to and from work, to and from doctor appointments, daycare, shopping and even church.

Critics of transit spending like to say that you can’t make demand by spending on big capital projects like, say, the Blue Line extension to Lynn.

But the people are already here!  They’ve been here for a long time.  They come whenever the latest condos get built on Highland Ave.

And those who don’t take the bus, drive.  Yes, I know I am in the minority of people who do not drive and yes I am lazy, didn’t overcome my disabilities, and so forth.  I know all that.

But I know, too, that in any urban area, when the density of people gets above a certain point, it’s time to consider investing in public transit, simply because the road networks will strangle the very communities that depend on them.

That time’s now.  It’s been “now” for years.

No public official will say this, because the scariest thing they could imagine is to have Barbara Anderson and the Tea Party at their door screaming “NO NEW TAXES!”  I’ve heard that before, I’ve heard it for years and years and years.

And, certainly, Salem is wealthy enough in the short term that the Tea Party platforms could “work”.

For a short while, anyway.

Will the shiny, happy, good, new (and rich) residents of Salem tolerate not being able to leave their driveway, not only in October, but year-round?  The traffic jams of Halloween in Salem are legendary, but the dirty truth is that they happen just as readily on a cold twilight afternoon in January.

I fear something even worse:  The Massachusetts Senate has approved a casino gaming bill.   In the bill, which still has to go to a conference committee to be finalized, there would be three destination casinos in the state.  One of them would be near Suffolk Downs.

The owners of Suffolk Downs have long looked to slot machines to provide the revenue they need to keep the horse track running;  horse racing as a sport has been on a long slow decline for decades and the track was once known as “Sufferin’ Downs” for good reason.

The owners recently bought Wonderland, the defunct dog track near the Blue Line that was closed after Mass. voters approved a referenda to ban greyhound racing.  Wonderland is where most people think a slot parlor may go on the North Shore.

It’s the northern end of the Blue Line.  And it is the worst migraine headache for me and all of us on the North Shore.  And it will happen.   There’s too much money being tossed around in executive suites and the State House to think otherwise.

Both my mayor and my rep, Driscoll and Keenan, are supporting casinos.  They’re doing so, I suspect, because of the hope of increased state revenue for cities and towns, the selling point most used by our state lottery, and they are hoping for infrastructure (roads & transit) improvements.

I’m not going to guess on the revenue, but I will guess that the casino operators won’t invest as much in the infrastructure as we would like.  They don’t need to.

They don’t need a Blue Line extension;  most of their customers will drive, and the few who don’t can be served by leasing a few dozen shuttle buses.  We’ll see them everywhere once the casino opens.  (They will also become the default recreational option for senior centers, but that is another matter.)

They won’t need to invest in anything else;  the casinos of Foxwoods and Mohegan Sun are, like most, self-contained so the visitor doesn’t need to go anywhere else.  Nowhere else but there to spend money!

Mayor Driscoll is deluding herself if she thinks this won’t ripple into Salem’s tourist revenue.

What casinos will surely do is clog up the roads and make it impossible for anyone in buses or cars to get around.

Unless, of course, you are going to the casino yourself.  That will be easy.

Otherwise, not so much.  The decay of the T will continue and no one will care.  What have I been doing for 4 years, again?  Will it matter?

Sunday, October 16, 2011

Salem Depot Update

Message board at Salem Depot HP parking area

Two updates on Salem Depot:  Several of us from the Salem Commission on Disabilities met here at Salem Depot with representatives from the Salem and MBTA Police to discuss handicapped parking problems at the station.  The Salem News wrote about this in some detail.

There wasn’t much that the police could do at the moment, since there is no continual monitoring of the area, by video or otherwise, but the T placed a message board, seen in in the image, for the interim.  October and Halloween represent the biggest month that this station sees in car and foot traffic, so this sign is not or should not be an unexpected expense for the T.

I never read the Salem News comment section, but there was one comment to that article I want to address:  The commenter believes that, instead of enforcing HP parking, that people with disabilities should use the T’s paratransit service, The Ride.

Um, they could.  But as I’ve written before, that service is very expensive to provide.   Using The Ride for direct service from, say, North Salem to Boston is just nuts if one can make the commuter rail.  And using The Ride as a shuttle to the station itself is practically a non-starter with Salem’s downtown traffic as bad as it is.

It turns out to be much cheaper, in the long run, for the MBTA to make their regular service accessible to people with disabilities.  The current management at the T seems to realize this, only after decades of neglect—and lawsuits.

My second update is more disturbing.  There was a robbery at the station one night last month.  A student was robbed of his laptop and iPod to the tune of $1,400, while waiting for a ride around 9 PM.

On reading this in the News, I can imagine the good people of Federal Street locking their doors in unison.  It’s not safe at 9 PM, after all.

I have been at the Depot late at night getting off a train.  It’s not at all unusual to call for a ride or a taxi.  9 PM is not a “wrong” time to be on the T.

My Mom told me stories of the old Salem Depot, not the famous headhouse that was demolished 50 years ago, but the two that sat under the south end of Riley Plaza.

A platform that was virtually invisible from the street. 

There were crimes and assaults on that platform up until it was closed in 1987 when the current station opened.

It is not acceptable to have someone minding their business at the station, waiting for their ride home, and being robbed. 

It’s intolerable that we should be taking these events  for granted, but many do.  I know, we’re in a recession, government is ineffective, and can’t we just wait for better days?  We’ll build a better Salem Depot to the shrine of Sammy McIntyre someday soon!

I’m coming to think that nobody in Salem wants a new train station, not the politicians, not the Salem News 101st Keyboard Brigade, not the neighborhood groups, or the “government-is-bad” people, nobody.

More on my next post.

Saturday, July 3, 2010

No New Bus Stop at Hawthorne Square

 

Highland Ave North at Market Basket

For some time, I and the Commission have been trying to get the MBTA to establish a bus stop inside the parking lot at Market Basket.  

Last fall, we thought we were making progress.

A colleague of mine got a response from Keenan’s office, quoted here:

In a message dated 2/1/2010 10:22:55 A.M. Eastern Standard Time, Lynne Montague writes:

Hi Rich,

I wanted to get back to you with the latest information provided by the MBTA on the Highland Ave Bus Stop.  John Matthew at RMD , Hawthorne Square Mgmt has withdrawn its proposal to build a new bus shelter as the company stated it could no longer justify the expense.  The company further noted that the path for the bus, that the MBTA had agreed to, was objected to by the neighboring shopping plaza.

Mr. Matthew said he would contact the MBTA if he learned anything new or if the management company wanted to make a new proposal.  The city of Salem has instructed RMD, Hawthorne Square Mgmt that the bus stop must be cleared of snow.

I will let you know if there is any additional information on this proposal.

Best,

Lynne

Firstly, I’m uncertain as to what kind of expense is involved.  We never heard any kind of dollar figure;  was this to be an actual physical shelter?  I’d understood this would be just a bus stop in the vicinity of Market Basket.

Since I first drafted this post back in February, I've gotten some more information that puts a little light on this story.  The Commission got a copy of a letter to the Mayor's office from the MBTA, specifically from a senior planner/analyst:

The layout of this shopping center does not support a regular bus service. This facility is designed with a large parking lot, few walking paths, and multiple storefronts that would create conflicts between buses, autos, and pedestrians. With the present layout, there is no appropriate place for passengers to board, exit, or wait for the bus. We would be interested in discussing this situation with the management, owners, and/or tenants of Hawthorne Square to see if there are possibilities for making changes or additions inside the center which might create an appropriate bus waiting area area and safe path for the bus to drive through Hawthorne Square.

The Service Planning group is also concerned with the additional trip time a rerouting would impose on existing customers. We estimate that each customer trip would be lengthened by 4 minutes or mour if routed via the shopping center. Extending selected trips during weekday midday hours or on weekends could minimize the additional passenger-travel time, since there are fewer peak-period commuters who would be negatively affected by such an extension and delays from traffic are less severe.

Snow removal is a serious issue that affects the quality of a bus customer’s trip; ordinances vary by municipality. In general, snow removal on sidewalks or at bus stops is the responsibility of the abutting property owner.

The Route 107 corridor has never been quiet, except perhaps before I was born, but it is true that it has gotten more congested.  In fact, the T has had to run fewer buses with increased headways (80 minutes on weekdays) on the 450 and 456 routes due to heavy traffic on Highland Ave.

Ms. McCoy is also correct in asserting that the Hawthorne Square parking lot is not really laid out for pedestrians--there are no reserved pedestrian paths between stores.

This problem is much more than just one elderly person trying to get to the grocery store from the bus.

It's about how we have emphasized the personal car above everything and arranged our city planning around the car and its needs for parking at peak periods.

The only answer we seem to have is "more development".  While I (personally, not the Commission) cautiously favor the new Wal-Mart proposed on Highland Ave. (and disfavor Lowes), I'm not sure how this will help.

As it is, the Commission has de facto "adopted" Rt. 107, 1A, 114 and all the other entrance corridors in the city where pedestrians and people with disabilities travel. 

MassHighway has control over many of these corridors, so city councilors cannot do a lot.  Jean Pelletier and Jerry Ryan are the nominal councilors over Rt. 107's path;  I have not spoken to Jean but Jerry knows my thinking on this and we have spoken numerous times.

I recently had to contact MassHighway to fix one of the new audible signals (ironically near Market Basket).  After two months it's resolved, but someone needs to go out there to adjust its volume.

A call here, an email there, a tweak.  Until the next issue. 

Now, the talk of my state rep and my mayor is on casinos and pledges to improve 1A and 107, which will certainly serve the proposed resort at Suffolk Downs.

A tweak here, a tweak there.

People won't like this solution, but the community leaders in the region will have to push for the Blue Line to Lynn.  Just stand on the Lynnway near Wal-Mart or on Western Ave. past the bus depot and count how many buses with passengers go by.   It's more than you think.

With due respect to my colleague Rich, who never fails to give me a word against the city on this issue, it's a tough one.

And the Commission seems to be alone in fighting for this.

Sunday, May 9, 2010

Salem Commission on Disabilities April 2010 Unofficial Minutes

[Sorry for the delay.  No pictures this post—DM]

The Salem Commission on Disabilities met on April 20th, 2010 at 4:00 PM.

Present: Jack Harris, Debra Lobsitz, Andy J. LaPointe, David Tracht, David Moisan, Charlie Reardon, David Martel and Jean Harrison.

Mike Taylor was unable to attend. Jean Levesque and Mike Sosnowski were not present.

Old Business--MBTA Bus stop, Market Basket

Jack: As most of you know, with the help of David Moisan, we’ve brought attention to the T bus stop at Market Basket. The city, with the help of Market Basket and the MBTA put a meeting together with suggestions. It has stalled. Not sure how, but in my discussions with Jason Silva, it ran into a roadblock. Market Basket and the T had a discussion, thought it was a good idea, MB offered to construct a shelter. But the T backed off, didn't like the location of the shelter.

I called Mr. Mathews to arrange a meeting with Jason in hopes of getting this done. It’s a safety issue.

Dave Moisan: I’d gotten a message from Richard Swinuch that he’d got from Keenan’s office; the abutter of MB (Shaw’s plaza next door) did not approve of the bus routing.

Jack: MB was going to pay for the bus shelter to be on their side of the mall.

Watch the Walmart/Lowes project--new stoplights and crosswalks are in now in the area but there could be reconfiguration. Several other stops on Highland Ave. present the same problems but the MB stop is the most notable.

MBTA New Garage at T lot

Jack: As some of you know, we won part of the fight: There will be a full-height platform--walk from the platform straight to the train (no steps). Now, we want a canopy over the whole platform. Previously, the T was citing money issues, plus the platform is on a curve and they didn't want to do it. From discussion with several people from the state, this is a win-win.

Charlie: There will be more wheelchair passengers, now that they can more easily board. Scott Maguire (friend of Charlie’s) once had to ride in the back of a baggage car.

Jack: This will help people on foot who won’t have to go up on steps.

David Martel: Will the boarding area be enclosed?

Jack: The T is still accepting comments.

Jean Harrison: They are more aware of the disabled.

Jack: A $300 million judgment (against the MBTA) will do that.

David Martel: Not to mention the curb cuts all over Salem. People take them for granted and if we took even half of them out, people would notice.

When we did the Access Monitor training, so many people from outside came to Salem and realized how good our access is compared to other places.

Charlie: The Witch Museum is accessible.

David Martel: Many of these people could grandfather out of the ADA requirements but they go ahead and make things accessible. Biff Michaud did that with the Witch Museum.

They put a lot of reenactments downstairs to make them accessible.

Andy: Another comment on the train platform; you may go on the train several times and not have any problems, but once you may have a problem. I had to call for my stop once and the train stopped halfway to Beverly. They had to back up to the station.

Jack: First rule: Disabled people need to let the conductor know where they will depart the train.

Andy: I did do that.

David Martel: Flight attendants do that too; I asked for assistance on a recent flight. You might hate doing that if you’re disabled—we’re all proud people—but we must do that.

Jack: Self-designation certainly helps. Safety, plus it helps them get to where they need to go.

David Tracht: The conductors must help too.

Andy: Blind people who get the ambition to travel, can get that ambition lost very quickly when they have a problem.

David Tracht: The train put me to sleep on the way home and I always woke up before my stop. I always wondered what if I didn’t? Partially-sighted people have particular problems in the fall and winter.

Jack: I ran into a new system today. They have automatic stop announcements that you may have heard in the subway (“Next stop...Government Center"). There is now a system on the commuter rail—but it has a female voice, which I don’t like.

Those who get a Blind Access Pass for the T: It's no longer good forever. It needs to be renewed every five years.

Renewal reminders aren't sent automatically.

Charlie: A blind person or a sight-impaired person can’t possibly read the fine print on the pass! What is he/she supposed to do?

Jack: I called the T to get a new one. They said they’re backed up. What do I do in the meantime? The phone rep told me something interesting: “Try the pass and maybe they’ll let you on!”

David Tracht: Won’t work on commuter rail.

David Moisan: I remind people that about five years ago, the T went to their Charlie Card system. They may be hoping people will fall off the rolls because they are deceased or they are no longer impaired.

David Martel: Where can you reload a Charlie Card in Salem?

David Moisan: Register the CharlieCard online. If you’re comfortable using debit online, this is best. All the buses have fare boxes that can be used to reload cards.

Most drivers are patient. Or you can go on the bus a few minutes before the trip. There are a few extra steps that involve tapping a button, tapping your card, inserting your money, tapping the card again and finally tapping the card one last time to pay the fare.

Jack: One of the drivers will help if you ask.

MAAB Update--4 First Street

4 First St. will get a site visit from the MAAB to review the parking lot access problem. We were hoping to do it this week but things came up. We’ll let everyone know when this is happening.

Variance at Morency Manor, Salem Housing Authority

Jack: The Salem Housing Authority asked for a variance. I handed this to David Martel and David Tracht since it would be a conflict of interest for me (and David Moisan) to handle it since I (and Dave M.) are SHA tenants.

David Martel: SHA wants a variance for Morency Manor. The control panel for the new elevator is in an alcove, but they want to put in a 2nd control panel. There should have been a variance in the first place from the contractor.

Variance at 76 Lafayette Street

Jack: Taco restaurant has been proposed for the unrented part of West Coast Video. The variance was requested before the building was even permitted, which we really appreciate. We will make a recommendation and send it along

Burba Dental (Highland Ave. @ Wilson Rd.) Variance

Jack: There are no HP parking spaces and ramp is not compliant. Tom St. Pierre will be back and we will discuss this. We want to know why the ramp is not compliant. I will let people know what’s going on.

Jack: The SRA had a meeting about outdoor seating. I talked about the direct path of travel. There was a problem involving the old Edgewater Café. They had seating that blocked off the sidewalk and got two complaints about it.

We will have to revisit this.

Dave Martel: Tavern in the Square: They flattened the traffic island and relocated the traffic controls. They did a very nice job and there are no access issues or trip hazards. They did listen.

Jack: We will have to watch this; summer will wind up quickly.

New Business

ADA Observance July 26, 2010

Jack: This year is the 20th anniversary of the ADA. I would like to put together some sort of good observance. The ILCNSCA is putting on an event. I'd like to have an event here, at Winter Island or Old Town Hall or the Ferry.

There are many accessible areas that are new in Salem that we should or want to highlight.

David Martel: Access training again?

Jack: Jeff Dugan is trying to visit every Commission on Disabilities in the state (200?). And is asking for an invitation (we will invite.) Regional meetings have happened, and the Disability Consortium Council has been doing some of these meetings.

Debra: Regional meeting in Salem?

David Martel: It’s possible. Visitor's Center is one possibility.

Dave Martel: For people starting up or reactivating their Commissions, Salem is an excellent model.

Incident on Bridge Street

Jack: There was a small article in the paper last weekend. A young lady in a chair was trying to get up Bridge St. near the motel with the MassHighway construction. A truck was parked on the sidewalk in the way, so she went around and the flagman on duty was very upset with her. Not that it’s necessarily the flagman’s fault, but the pedestrian should have gotten assistance. I brought it to the attention of John Jodoin about this.

Charlie Reardon: I talked about this with the construction crew on Bridge St. The flagmen don’t want to work on Bridge St. Officers will work Bridge St. while the [civilian] flagmen will do side streets.

Jack: My interest in this is that the flagman was obviously unhelpful. The truck should not have been parked there.

David Martel: It brings up a thought about school crossing guards. I wanted to cross the street at Boston & Essex Sts. and there was a crossing guard. I asked the guard for help crossing, and he told me I wasn’t a kid. Well, I’m not a senior citizen but still the traffic is horrendous.

Jack: Is the crossing guard solely for children? There needs to be clarification one way or the other.

David Moisan: I have had the opposite—crossing guards who insisted I cross the street with their assistance.

A Frame Signs, City Council Committee Meeting

Jack: Regulations for A-frame signs are being reconsidered. Joan Lovely is heading the committee to govern over these. We have asked for an invitation to a meeting. These signs directly impact the path of travel.

Andy: Nothing specific in the ordinances about disabled or blind, only the general 36 inch rule. If there needs to be consideration for the disabled with those signs, we need to speak out.

Charlie: I suggested to Rinus [Salem Chamber of Commerce] that the red line at Daniel Low's (now Rockefeller's) be cleared of any signs, seating and etc. and make a clear path of travel. This was done last year and all but 2 merchants complied. Signs should be near a tree, pole or other landmark when possible instead of standing on their own.

Andy & Dave Martel: Suggested a map similar to the official visitor's map, but instead of the usual red line, a blue line detailing path of travel and accessible pedestrian signals. A woman from Winthrop told me she has no idea how to safely get from one point of interest to another in her wheelchair.

Dave Martel has volunteered to do this.

Andy: Salem is a great place to visit for people with disabilities. Just go to any place where people from around the state meet, like the Carroll Center for the Blind. They all say Salem is great!

Jean Harrison: Put a sign outside designated restaurants?

Charlie Reardon: I’ll make the sign. It’ll have the HP logo and “courtesy of the Salem Commission on Disabilities” (blue and white).

Dave Martel: The information is sent also to Shaugnessy for use by the patients and families.

Other Business

Independent Living Center of the North Shore and Cape Ann—911 Indicator Form

Andy: The ILCNSCA had no idea about the 911 indicator form; they are aware now, but for now we need to remind every disabled person in Salem to fill out the 911 indicator form in case of emergencies. All information is confidential.

Jack: 911 Indicator form has been on our website for some time. They just have to call us or attend our meetings. They have not. They've refused to work with us. They haven't even asked us to be part of variance requests. They know we're part of the process and they just don't want to do it.

Andy: If they don't know about it and I didn't know about the ILCNSCA, what's more important is that some disabled person needs to call 911 and it's a crisis--the person won't be thinking of that. Point is, when they fill out the form and something goes wrong, they will know the situation, you're in a wheelchair, you need rescue, etc. We need to bring it to everyone's attention. 25% of Salem's population has a disability. (!)

We need to get the point out.

David Martel: Can put out a flyer?

Andy: We need to work on this continually, and never stop.

Debra: Send the forms to the ILCNSCA?

Andy: I do my show for TIC and send the information everywhere.

Jack: The ILCNSCA gets this?

Andy: Not unless they listen. It's important enough that we need to make this a priority.

Audible Signal at Market Basket Southbound

David Moisan: The audible signal at the bus shelter outside Pep Boys (Market Basket southbound) broke several weeks ago. I notified Jason. The Polara signal was replaced two weeks later with a non-audible button. Need to check back with city engineer to see if audible signal will be replaced. The crosswalk needs audible signals at both sides for them to be effective.

David Martel: I’m surprised there are no audible signals at Salem Hospital. The sun obstructs view at sunrise and sunset.

David Moisan: There are no new signals north of Salem High--all signals between Essex St. and Wilson St. are the old non-audible signals.

Jack: Since you started this query, can you follow up with Jason?

David Moisan: Yes, I will check on that one. And I will ask about what will happen north of the high school. Boston St. is another issue entirely, but my immediate concern is the Market Basket signal.

Adjournment

Next Meeting is May 18, 2010,

Guest will be Verizon [Tom Boudreau]

Thursday, February 25, 2010

Salem Depot Design Hits 30 (Percent)

Conception of garage with city-developed structure at left

The MBTA held its meeting on the 30% Design Phase of the Salem Depot project last Tuesday night.

I wouldn’t characterize the opinions as “mixed”;  there were a lot of helpful suggestions and not a lot of ranting as one can often hear at other public meetings.  I thought Bill Luster’s comment was very thoughtful,

Bill Luster, a former Salem city planner, reminded MBTA officials to heed a local mantra — "in Salem, design matters." He suggested they put as much brick and granite on the garage as possible.

But for the most part, the particular appearance details are not my dog in the fight.  This is what I thought was important, and what I will send to the MBTA, the mayor’s office and my chairman of the Disabilities Commission:

First, I was gratified and surprised to hear that the T decided on the full-height platform option.  Last I’d heard, a half-full-height, half-ground-level platform was being proposed in the original design documents. 

A full-height platform is the right thing to do for a busy station like ours. 

Second, I am focused on the Bridge St. pedestrian entrance like a hawk.  I use this entrance nearly every day.  I was hoping for more details on the construction of this important vehicle ramp and pedestrian entryway.

I realize some still want a footbridge or a tunnel in that area.  I’ve been in and around Boston’s numerous footbridges, enough to know that one cannot put in such a bridge without changing the local pedestrian environment dramatically.  Many footbridges (the one over Huntington Ave. to Copley Place, for example) further isolate pedestrians and make their immediate area unfriendly.  So I wouldn’t advocate for this—it may well make things worse.

I also remind the T that the waiting area is still an important part of the project that many of the riders will be close to every day, whether they mean to or not.

The current canopies, which are not continuous, should be torn down and replaced with a continuous canopy. 

As well, recall what I’ve said before about electronic signage:  We must see an electronic, easily read and continually updated train display.  I also note that the T has started a pilot project to provide next-bus information.  One hopes that by 2011, it will be expanded to include Salem’s service area.

The MBTA heard our comments, also, about security and safety.  These are ever important, not only for people with disabilities but for all those who use the station at any hour of the day.

Lastly, I’m responding to some at the meeting who don’t want the proposed ramp, who are concerned about “walking further than they have to.”

I can understand being at the top of the steps to a train station and seeing your train leave.  It’s happened before and will again.

However, Salem would not be unique in this.  There are many stations in the T system that require a long walk to the exit, or to another train, depending on the location.  On the Red Line, South Station and Downtown Crossing are notorious mazes, particularly to and from the Silver Line.  On the Blue Line, if your car is parked west of the Wonderland platform, you need to go up and down stairs, quite a few of them, before you can even hit the turnstiles to leave.  So don’t think Salem is put upon in particular.

I absolutely hate the current stairs.  I fell down them once, and while physically long since recovered, have never stopped my hate for them in the least.  There is no way I would tolerate a design that had me go down the existing stairs and across a roadway at ground level before I got to my bus stop.  No.

Some at the meeting, and in the filed comments talked about the “few disabled people” who use and need a ramp compared to the “many”.  This isn’t the most fair comparison.

A station like Salem’s is used by many people, big surprise there.  But it is also used by visitors.  Many visitors with disabilities have told us at the Commission on Disabilities how easily they were able to get around and how much they enjoyed their time in the city.  About 20% of Salem residents have a disability—1 in 5 of us.  We don’t know how many of these are mobility impaired, but we do know it is more than a mere “few”.

Accessibility on the T only works well when all the stations are accessible.  Many disabled people travel to Salem with friends and family.  If a disabled person has problems at Salem, he or she likely won’t come back—and nor will their friends!  In a tourist-centered city like ours, that’s been unacceptable for quite some time.

I’m encouraged by the progress so far and we’re looking forward to the next phase.

Comments are being accepted through March 5th.  The comment deadline is this Friday, March 12th.

Contact Tom Rovero, MBTA Design and Construction, 500 The Arborway, Jamaica Plain, MA 02130

or Karen Despirito, Senior Community Affairs Coordinator, (617)-222-6513

kdespirito@mbta.com

Thursday, February 18, 2010

MBTA Meeting on Salem Depot

MBTA garage from Washington St.

First, I want to apologize for not blogging much recently.  I’ve had a big computer project at SATV that we just finished.  The Commission hasn’t met since December—our February meeting this past Tuesday was cancelled due to the weather, which was at its worst at 4 PM when we meet.

And I’ve been burned out:  Politics have been very unpleasant recently;  there’s an ugly undertone to civic affairs these days.  And that doesn’t make blogging fun.

The MBTA will hold another public meeting on Salem Depot next Tuesday the 23rd, at the Carlton School.  As promised last fall, this meeting is called at the 30% design point.  The full plans are on the MBTA web site.  Here is the current site plan:

Salem Depot Site

I note that the covered pedestrian walkway that was in the original plans is not seen in this revision.  Pedestrian access from Bridge St. is critical to this project since it will serve the new courthouse complex as well.  I also note the architects went with Option 1 for the busway;  I would have much preferred the busway be closer to Bridge St.  So much for that.

I’ve recommended that the Commission on Disabilities take these points to the meeting:

  1. We must have a full-height platform for the whole length of the platform;  the T has favored a half-full-height/half-low platform.
  2. The plans show partial canopies over the platforms, much like the existing station.  There should be a full canopy over the entire platform.
  3. There must be good pedestrian access from Bridge St.  There is going to be a vehicular entrance ramp where the current stairs are now, and features like the ramp can be pedestrian-hostile.

It’s important, though, to keep this project in perspective.  We’ve needed a garage and added parking at Salem Depot from the day it opened over 20 years ago.  I’ve hated the appearance of the station, the platform at the end of nowhere, and most of all the stairs.

Some people in Salem want the perfect.  John Ronan, the newly-elected Ward 5 councilor, filed some good comments that I quote in part:

First, I’m glad this project is funded and going forward. The station is in true need of additional
parking. Salem is extremely fortunate not only to have a train stop but to have one in the
downtown area walking-distance from many of our shops, offices and attractions.
Often, Salem planning issues get bogged down in search for a fanciful perfect solution. I saw
seeds of this taking root in the statements of a few attendees advocating a mixed use or an air-rights platform in lieu of a garage. Without any commitments or even any prospects for the private development aspect of such mixed uses, they simply aren’t viable. Even if the City agreed (as would be necessary) to couple its lot with the MBTA lot it may never find
a developer willing to build on top of an air rights-platform on conditions favorable to the City. All these components certainly would not come together by the December 31, 2011 deadline.
Therefore, I believe Salem is correctly positioning itself for the future by keeping its crescent
shaped lot separate from the MBTA lot. The garage project should proceed as a garage project.

If the idea of an air-rights project had been proposed in the early 2000’s, I would have supported it.  Unfortunately, projects like that are subject to the vagaries of funding.  We can ask the Columbus Place developers how well that is going. As it is, until the governor gave a commitment to Salem Depot, the project would have been a dream project, 5 or 10 years in the future.  And it always would have been.

Because of the land situation, the MBTA probably won’t get to resolve all of the issues that were brought up at the earlier meeting.  In particular, pedestrian access from North Street is a difficult and ugly problem that I fear won’t get resolved.

This is probably the best we’re going to get.  The three points I outlined are the most important.  If they can be resolved to my satisfaction, I’ll be happy with the result.  As will most Salemmites.

Tom Rovero is the MBTA contact person for this project and he can be emailed at trovero@mbta.com.  

Monday, November 2, 2009

Double Decker Rail Cars Visit Salem

Courtesy John Arico, this is a video of double-decker K cars that ran on the north side (us) to Salem this year.  They can indeed run through the tunnel, check it out around 3 minutes into the video.

Check out this thread on Railroad.net.

Now, if we can have these for the 7:25…

Tuesday, October 20, 2009

More Frustrations with HP Parking Enforcement

MorencyHPspace

Last post I mentioned one of the hot buttons of the Salem Commission on Disabilities, sidewalk access.  Recently, Ken Bonacci, a colleague and former member of the Commission, brought up another frustrating situation for us over the years:  Handicapped parking violations at Salem Depot, and elsewhere around the city.

Ken has been very forward in dealing with the situation, more than most people would contemplate.  The MBTA police have directed him to stop:

Lenehan [Lt. Robert Lenehan, MBTA Police] said the T asked Ken Bonacci, a former Disabilities Commission officer, to stop approaching cars that are illegally parked in handicapped spaces and asking drivers to move, in part, out of concern for Bonacci's safety.

The MBTA recently received a two-page letter, apparently written by a commuter, complaining about the enforcement actions. As a result, Lenehan sent an officer to the Salem train station to speak with Bonacci.

The transit police want to make sure the well-intentioned enforcement actions of Bonacci and other volunteers working with the local commission don't result in a confrontation with an angry motorist, the T official said.

The article goes on to explain what the Commission has done:

Disability Commission members were trained several years ago by the Salem police in volunteer enforcement of handicapped parking violations, Harris said. They used to take photos of cars, write down license plate numbers and turn the information over to police, who would then issue parking tickets.

They were also given identification badges, which Bonacci said he places against the driver's window to identify himself before speaking to a motorist or asking a driver to move.

"He was doing exactly what ... the commission was trained to do," Harris said. "He just knocks on a window and politely explains that they're in a handicapped spot and they don't have a placard or plate and need to leave."

As part of the training, Salem police emphasized the need to avoid any kind of confrontations, Harris said.

The Commission has had a long history of frustration with HP parking enforcement and we have experimented with some different approaches, including the one mentioned in the article.

At one point a few years the Salem PD gave us "informational" ticket booklets which were to be forwarded to the Parking Department. Originally, the informational citations were to be a kind of green stamp; if a driver collected several, there would be points on the insurance and a real citation.

When we asked about the disposition of the tickets, we were told they would be thrown away. We gave up on that one.

The Salem PD tried volunteering us to go around with digital cameras, when the technology was newer, to monitor HP parking spaces, but there weren't enough volunteers, nor was there the money to have the PD do it.

Our latest idea, so far, isto get funds to pay a detail to monitor parking, again at key spaces like the train station and downtown. This would relieve us from the situation that Ken was in.

I would not have done what he did in that situation. I use the train station regularly; I don't drive but I can easily walk to the handicapped spaces and see who's in them. I wouldn't have confronted anyone. But Ken is a very forward person. He did this on his own initiative. That's why we respect him.

Ken was a very respected member of the Commission, and we consider him a dear friend. Ken has been my ideal as a commissioner for the 2 years I have held the position. 

With the turmoil surrounding the MBTA, we're not certain how the MBTA police will be able to enforce the spaces until the new station is built. I understand that on weekends the T police is so thinly staffed there is only one officer to serve an area from Boston to New Hampshire.

Nevertheless, we do hope to leave this to the police. We really do. But Ken did not act out of thin air, but out of the many years of frustration that drivers with disabilities have experienced.

Many of whom, by the way, will complain to us.  That’s OK, it’s our job to hear them, but as with our sidewalk issues, we are dependent on the police and the rest of the government to help us out.

No doubt, in the near future, we’ll be meeting with Chief Tucker to get some ideas on dealing with parking scofflaws without being cops ourselves.

Sunday, October 18, 2009

Day in the life of the T

Good video on many of the modes of the T. I've taken them all except for the Mattapan trolley and the commuter boat, though I have taken the Salem Ferry a few times.

Thursday, October 15, 2009

Comments on the Salem Depot Project

Model of proposed Salem Depot garage

These are comments I’ve sent to Thomas Rovero of the MBTA, and the mayor’s office on the proposed Salem Depot garage. There will be another public meeting sometime in December.

From: David Moisan, Salem Commission on Disabilities

To Thomas Rovero, MBTA, Mayor Kim Driscoll, chief-of-staff Jason Silva:

Dear Mr. Rovero, Mrs. Driscoll, Mr. Silva:

I’ve attended the public design meeting on the new Salem Depot garage and have read the report posted on the MBTA web site. I believe it is a good starting point and a very welcome development.

There are, though, some concerns I have with the design. The word that comes most to mind is isolation. There are elements of the design that serve to cut off train and bus riders from downtown.

First, I’ll grant that a good part of the isolation comes from the original design of the traffic rotary on Bridge St., and the original use of the Salem Depot area as a maintenance area, interlocking tower and track junction by the old Boston and Maine railroad. It had been occupied for this purpose by the B&M for many, many years.

At one point in the past, the pedestrian passage to Salem Depot (when it moved to Bridge St.) was fenced off from traffic. But it was still a very dangerous place to walk, and very unfriendly in any event. Not what we want to represent Salem to train travelers.

Any design would have to work hard to overcome these problems.

But some things that were proposed at the meeting just accentuate this isolation.

The existing train platform, and the proposed half-full height platform is one example. Wheelchair or cane users, and on the weekends, all users, must go to the very end of the platform.

From the end of that platform looking north, you can see the Carlton School on Bridge St., a full mile away.

It actually seems closer to the platform than downtown!

I remember when the depot moved to Bridge St., trains stopped much closer to the tunnel portal. A few years later due to ADA requirements, the mini-high was built and trains moved further up north.

I support the ADA. The ADA is not the problem. But I didn’t like and still don’t like going what seems like miles from the Bridge St. entrance to get a train.

I’ve read the report on the train platform. I understand the great difficulties involved in making a high-level curved platform accessible. But I must agree with my chairman on the Commission on Disabilities, Jack Harris, and push as hard as I can for a full height platform that can be reached a short distance from the garage.

My second point is the bus berths. I ride buses from Salem Depot frequently. For I and many other people downtown, Salem Depot is the closest place to get a departing bus, since most of the bus routes skirt downtown when they leave the station and there are no closer stops.

The preferred design alternative has the bus berths on the north side of the station, with the garage between the buses and the Bridge St. entrance.

As with the train platforms, this is almost as far as Carlton School! Perhaps when I need to take the 456 I should just walk up Bridge St. to the school.

I much prefer having the bus berths along one side of the garage, or even two, as it is in one alternative presented in the report.

And they must be sheltered or at least have canopies like the current bus shelters. Some bus routes run at 80 minute or even 90 minute headways so riders will want to use the train’s waiting room; in dead of winter with kids in tow they’ll need to.

On the waiting area, I want to see it on the platform side of the station, in sight of both the train tracks and the bus berths. People will have an eye out for their train or their bus.

There must be digital signage, and automated announcements. I’m aware the T is phasing in a new generation system; Salem must have it. We must be able to sit in the waiting area and hear , and see “The next train to…Newburyport…is now approaching”, similar to rapid transit announcements. Within the lifespan of the garage, there’ll be a similar technology for bus passengers so they’ll know how long until the next 455 comes. The design of the station must allow for these improvements.

My last comment is for the City of Salem.

As all of us know, the Courthouse project, and many other projects, are changing downtown.

The city is starting at a disadvantage; as noted in my opening paragraphs, the area of Bridge and Washington Sts. has never been made for pedestrians. Visitors, jurors and court personnel alike will use that intersection constantly.

The City must do what MassHighway has done for the recent Highland Ave. crossing reconstruction and put modern audible talking pedestrian signals at Bridge and Washington.

There’ll probably never be a footbridge or a tunnel in that area in my lifetime; neither are practical.

The city, and the MBTA will have to work very hard in the coming months to make this version of Salem Depot welcoming to commuters and visitors. They need to make Salem Depot part of Salem’s downtown once again, as it hasn’t been for over 50 years.

The design is a very good start. I’m looking forward to future meetings to make this the best it can be. I’ll probably be one of the first to go down the ramp into the new station when it opens.

Make me proud of it, and proud of my city.

Monday, October 5, 2009

Salem’s Steps of Doom to Disappear?

Salem Depot's "Steps of Doom"

According to the Salem News, these steps of doom may go away in a few years:  The state is funding the reconstruction of Salem Depot.

I won’t consider this one in the bag until the construction crews show up.  There’s still the meeting tomorrow night, and if it’s anything like the courthouse meeting, we could be at this a while longer.

In the meantime, I’m going to redouble my efforts, with the Commission, to improve pedestrian access on Bridge St. and place talking audible signals at every signaled crossing downtown. 

Sunday, October 4, 2009

First Thoughts on the MBTA Garage Proposal

Conceptual rendering of Salem Depot

As I mentioned in my last post, the MBTA has released design plans for the new Salem Depot.

Quoting the executive summary, these are the goals and highlights:

The intermodal center design will include 750-900 garage parking spaces, five bus
berths for MBTA buses, drop-off / pick-up parking spaces, taxi parking spaces, covered
storage, enclosed waiting, elevators, and an accessible ramp. The height and massing
of proposed structure will respect the historic context of Salem downtown. Exterior
building materials are anticipated to include masonry and brick in keeping with site
context and existing municipal buildings. All facilities will be designed to meet code
requirements and accessibility guidelines.
Four design options were developed to address the functional needs of Salem Station.


All options include the following features:
Six total parking levels (includes ground and roof levels)
Lower building height on Bridge Street side (4 stories at 44 feet tall)
Median building height on North River side (6 stories at 66 feet tall)
Clear pedestrian connection from Bridge Street to train platform via raised plaza
Additional vehicle ingress/egress from Washington/Bridge Street intersection
Higher grade level floor-to-ceiling height for buses and more natural light
Improved and direct handicapped access to train platform via covered ramp
Safer pedestrian access via dedicated sidewalks on city and river sides
Straight façade on Bridge Street side respects urban character of street
Scalloped façade on North River side breaks up building mass
Express ramps at center of building allow for safe and fast vertical circulation.

I believe the design is a good start.  We have not yet seen any drawings or conceptual views in the context of the existing parking lot, but it appears that the garage won’t impact on the North River vista, at least not any more than the other projects in the area, such as the court complex.

Many people, myself included, had the idea that the garage structure would be built right up to the ramp fronting Bridge St.  In fact, the Commission on Disabilities had debated this point a few years ago, during the first abortive attempt at a new depot design during the Usovicz administration.

Several commissioners had hoped that there would be direct access to the street from the parking garage.  Unfortunately (or fortunately) this isn’t going to be:  Salem owns and will continue to own the crescent of parking spaces just inside the entrance to the station.

Salem Depot Sections of Ownership

So, there will be a pedestrian ramp from Bridge St. to the 2nd level of the new garage, which will pass over the traffic lanes at ground level.  The ramp can be seen in the opening illustration, in several variations;  some open, some enclosed.

Salem has very few enclosed ramps, and those all connect buildings:  The Salem State College Library to Meier Hall (soon to be demolished), the ramp that connects the Davenport building at North Shore Medical Center to Shaugnessy Rehab, and the newest ramp that connects One Salem Green (now owned by Salem Five) to Salem Five’s main building.

This will be the longest ramp of its kind in Salem and the first to pass over a roadway.  Visitors to Boston’s Back Bay may recall the walkway that connects the Prudential to Copley Place over Huntington Ave.  That walkway is not a favorite of many architectural critics.  Unfortunately, the siting of the garage doesn’t leave many options.

There will be a car entrance next to the current pedestrian entrance on Bridge St.  I’m not certain how well that’s going to work out, particularly for courthouse-bound walkers.

I’m particularly concerned about access to the bus terminal portion, since I use that mode very frequently.  This is Option 1:

Salem Depot Ground level option 1

The bus platform is quite a long ways from the street.  In general I’d like not to have to walk so far to the bus.  On those days that I’ve taken the train in to Boston, I’ve stood on the platform at the very end of the station and wondered out loud if it would be quicker to walk to the Carlton School (visible from the platform!!) to get the train.

I like Option 2A just a bit better:

salem depot ground level option 2A

The bus bays appear a little closer to Bridge St.  Keep in mind, though, that only five of the bays are “live” and take passengers;  the other two are layover berths.

The differences in the other options pertain to where the taxi stand and the kiss-and-ride areas are located;  I have no opinion on those.

On the train platform itself, three options have been presented.  Currently, it is a low-level platform with a mini-high platform at the very end of the track (within sight of Carlton School!)  That is one option.  Another option would be to make the entire platform high-level (as at Newburyport and Central Square) but there is a curve in the track that makes it difficult to get ADA compliance.  The last and preferred option is to make the northern half of the platform high-level and the southern half near Bridge St. low-level as it is now.

There are more considerations that will probably be addressed at the meeting.  Another quote from the executive summary:

The design team will provide precedents for proposed parking facility to further the
development of exterior treatments, planning, operational efficiencies, and architectural
design. Please see Review Draft Memorandum dated 16 August 2009 attached in
Appendix 10.6 for further design discussion from the City of Salem. Planning items to be
further reviewed and developed include:
Security for underside of bridge entering second level of proposed parking facility
Pedestrian access from Federal Street and North Salem neighborhoods
Lobby area for waiting with amenities such as coffee and newspaper vendors
Covered bus loading area
Operational efficiencies to be resolved include:
Pedestrian circulation within garage
Decision for entry/exit to be attended or automated
Determining appropriate number of entry and exit lanes
Improve efficiency in parking layout
On site vehicular, bus, and “kiss and ride” circulation

The City (or at least the mayor) wants an enclosed, heated waiting area.  I’d suggest security for the ramp itself be considered, particularly if it is enclosed.

Construction would be completed in December 2011, two years from now, assuming it takes eight to ten months to complete the environmental permitting. 

This also very much assumes the City and state can go forward without any delays.  

We’ll see this Tuesday.

Wednesday, September 30, 2009

Salem Depot Design Plans Posted

Salem Depot parking lot, nearly full at 7:30 AM

The MBTA has released its design plans for Salem Depot.  I haven’t looked at them yet.

There will be a public meeting on the design next Tuesday, October 6th, 7 PM at the Carlton School.  I plan to be there.

Friday, July 10, 2009

MBTA Cuts and Fare Hikes

455W at North St

As many of us expected, the MBTA has proposed a 20% fare hike in return for not cutting service.  Otherwise, the MBTA will drastically reduce service to Salem and elsewhere.  I’ve been dreading this possibility for some time. 

From the MBTA’s booklet, and No Free Transfer, the details for Salem.

Bus Service:  These routes would be eliminated:

  • 451 Salem-North Beverly
  • 459 Salem-Downtown Crossing
  • 465 Salem-Liberty Tree Mall (and all routes in and out of Peabody)

These routes would be changed:

  • 450 Salem-Haymarket via Western Ave.
  • 455 Salem-Haymarket via Loring Ave.

No details were given.  (My guess:  Service cut back to Wonderland, as on the weekends, but with increased waits for a bus.)

Bus service would be reduced after 8:00 on weekends.  Service from Lynn garage (where Salem routes originate) would be discontinued on weekends, implying no service.

Private bus service subsidies would be eliminated:

  • Beverly
  • Peabody (shuttle service to Centennial Park from Salem)

Commuter Rail:

  • No service after 7:00 PM weekdays
  • No service at all on weekends

Commuter Boat service will be eliminated.  No details how this would affect the Salem Ferry’s new commuter pass program.

The RIDE:

  • Beverly and Peabody would no longer have RIDE service.

It should be an understatement to say this would be very bad for Salem.  If we accept the cuts, where would it stop?  The Driscoll administration (and I) wants a new Salem Depot.  If we lose most of our service, where would the justification come from for this (so far) $30 million project?

I’m particularly upset (though not surprised) over the prospect of losing the 465.  It has been a bus route for decades, having been run by the Eastern Mass. Street Railway, Michaud Bus, ABC bus and the MBTA.  It’s how seniors without cars get to the senior center in Peabody, and how they would get to Salem’s proposed senior center.

Several of my physicians are in the medical offices behind the Northshore Mall.  I and others would have no way to get to them without a car!  I can hear people say, “well, you shouldn’t be out shopping anyway!” since the route has served both shopping malls in Peabody, but doctor appointments, well…

In the past, the T has never cancelled a fare hike.  It came several years ago when the T introduced its CharlieCard, and I’m not expecting anything different.

All of the outrage over fares is too familiar.  As is my cynicism over people who tell T riders to pay their own way while they clamor for road projects on the state’s dime.  Gas tax?  Nope.

It’s not true, as some think, that “the poor” or those on “fixed incomes” get a break on fares.  Some people with disabilities can get a discount, as can seniors.  But virtually everyone else who cannot afford a car pays the full rate.

Public hearings and “workshops” are set.  One is in Salem:

Monday, August 17
City Hall Annex, Room 313
120 Washington Street, 3rd floor
6:00-8:00 PM

The main public hearing is in Boston:

Thursday, August 27
Boston
State Transportation Building
10 Park Plaza
5:30-7:30 PM

Specific details on the fare hikes. 

UPDATE:  Disabled riders are already affected.

Saturday, June 20, 2009

MBTA schedule changes for routes 450, 456 and 455

MBTA Bus Sign 2009-06-20  (5)

The MBTA has announced schedule changes for Salem bus routes effective Monday. These changes were first put forth by the MBTA last winter and they affect route 450 and 456 significantly during the weekdays.

Route 456: This route will now run every 80 minutes (1 hour and 20 minutes) instead of every 60 minutes. Buses leave Salem at 9:40 AM, 11:00 AM, and every hour and 20 minutes until the last bus for Lynn at 4:20 PM.

From Central Square, the first 456 leaves West Lynn at 7:00 AM and 8:30 AM (rush-hour service), and starts its regular service at 9:00 AM, 10:20 AM and every 80 minutes until the last bus for Salem at 3:35 PM.

Route 450: Weekday service outside rush hour (9 AM to 4 PM) runs to and from Haymarket at 60 to 80 minute intervals, leaving Salem at 9:10 AM, 10:20 AM, 11:40 AM, 1:00 PM, 2:20 PM and 3:40 PM. Buses from Haymarket run at 9:10 AM, 10:20 AM, 12:00 Noon, 1:00 PM, 2:20 PM and 3:10 PM.

Route 455: Quoting the T:

The 5:19 AM outbound trip leaving West Lynn for Salem Depot will now leave at 5:16 AM.
A new trip will leave Salem Depot for West Lynn on Route 455 at 7:00 PM.

No changes to weekend service on the 450 and 455 (456 is a weekday-only route.)

The biggest changes are to the 456, a route I take most often. The T cites congestion on Western Ave. and 107. It’s true that over the past 20 years, Rt. 107 between Salem and Lynn has gotten more and more congested—the recession hasn’t changed it a bit! When the T cites “schedule adjustments”, they’re really saying they can’t keep to the schedule, or more importantly, they can’t afford to run extra buses to maintain it.

The 456 in particular gets quite a lot of use by Lynn residents who shop on Highland Ave. and use North Shore Medical Center.

As I write this the T is contemplating a 20% fare hike and service cutbacks. There’s been no news at all, despite the much heralded transportation bill before the Governor.

MBTA bus schedules are revised every quarter; the next revision will be in September. If the ax falls on MBTA service in Salem, it’ll happen in December, the next quarter after that. I’ll be watching.

Sunday, April 12, 2009

Proposed MBTA cuts and Salem

The Globe has published the list of cuts the MBTA is considering.  They’re devastating.  Here are the cuts that affect Salem:

Bus
- Reduce weekday evening bus service by 50 percent after 8 PM.
- Reduce weekend bus service by 50 percent
- Eliminate service at Quincy and Lynn bus garages after 9 PM. weekdays and all day on weekends
- Eliminate highest net cost per passenger bus routes
- Moderate "surgical" cuts to bus service
- Eliminate routes due to network redundancy
- Reduce THE RIDE service area

Operations and Service Development

- Eliminate Suburban Bus Program subsidy
- Eliminate Commuter Boat Program subsidy
- Reduce THE RIDE service area to within 0.75 miles of fixed route in 29 communities

Commuter Rail

- Eliminate weekday commuter rail service after 7 PM.
- Eliminate all Saturday and Sunday commuter rail service

The impact:

  • Salem would be unreachable on nights and weekends via commuter rail.  This would cripple Haunted Happenings—we depend on the train as the main means of transportation for revelers.  It would be impossible to hold events at night if people couldn’t get to Salem at all via public transportation.
  • Salem commuters would be trapped by their cars;  as many people have pointed out, they’d have to drive into Boston if there were even the chance they would have to work late.
  • Salem bus passengers will not be able to get anywhere on the weekends if service from Lynn Garage is stopped on weekends or early evenings  (If your domestics need to shop for themselves, I guess that’s a shame.)
  • The surgical service cuts the T is considering would probably include the 451 and 465, both of which have had trouble getting ridership
  • The shuttle service that serves Peabody’s Centennial Park—an employment center—from Salem Depot is in danger.
  • Lastly, RIDE service for people with disabilities is in considerable danger of reductions.

Driscoll and Keenan need to stand up and take this as a serious threat to Salem, which has paid into the MBTA system for decades.  John, don’t wait for your masters to tell you what to do:  Pass the reforms you’ve talked about with me (over and over again) and keep this from happening.

Update:  The North Shore Alliance for Economic Development says the cuts would be devastating not only to Salem but the whole North Shore.

Update:  This story made Globe North this week (5/3), and Boston business leaders criticize the cuts.

Thursday, February 5, 2009

Salem Depot Garage inches forward

The state has released money for design of a new Salem Depot.  New figure for the garage and depot is $46 million; one commenter on the Salem News wonders why it’s so high.  It is a lot of money that would have been better off spent sooner.  I suggest charging the amount to those people who held up this for years until more “studies” could be done.  If  a neighborhood association knew it could be liable for unwarranted delays, it might be more careful in judging just how its positions might affect other neighborhoods and the city as a whole.

No more studies.  Just build it.  Mayor Driscoll thinks the same.

Another commenter asks why we don’t have double-decker trains, which are desperately needed on the Rockport line (try finding a seat on the 7:25).   The MBTA has let out a contract to buy double-deckers from a Korean firm.    Here’s a image—presumably an artist’s conception—from eDaily, Korea:

There’s been a lot of concern about the build quality of these trains, but it’s a done deal.  I’ve heard, though, that these trains will have electronic signs and automatic stop announcements, like on the Blue Line.  At a station like Salem where any given train can go to one of three places on the same track, this will be helpful.

Now, if the T could just get some new locomotives…

Wednesday, February 4, 2009

Walking in Salem in the Winter

The Salem News followed up on my earlier blog post, The Most Dangerous Bus Stop in Salem;  Tom Dalton’s article, “Worst Bus Stop in Salem?” touched on most of the points I made.  The Mayor’s office is looking at a few things they can do;  one thing they can’t do, according to the MBTA, is put a bus shelter there.  As I’ve suspected, there is no room on that sidewalk.

The solutions available are to reroute the 450 and 456 buses to go through the parking lot to Market Basket, as Market Basket has asked for, or simply to plow the sidewalk. 

My colleagues and I in the Salem Commission on Disabilities all agree that we should not let this drop when the last snow melts this season.  There are numerous other places on Highland Ave. that are problems for pedestrians, such as at Wal-Mart ,and the inbound lane across from CVS on Essex St. and we need to look at them all.

I’m glad, of course, that Tom Dalton put a spotlight on this issue, and the Commission, but I must move on to other problems. 

One glaring problem all winter has been the sidewalk at the one-hour lot outside Museum Place, seen in the photo  above.  Except for a brief period in December when the snow melted, it has been impassable all winter.  St. John’s Church does not clear its sidewalk on the opposite side, and the street itself is very narrow.

It’s no less dangerous than Highland Ave. to a pedestrian in the winter.  And it is the route I take to SATV every day.

Lastly, here is a photo that illustrates what the Commission has to contend with in the winter:

This was taken on Sunday morning outside the Zisson elderly housing complex at the Salem YMCA [and the space belongs to the SHA, not the Y—correction.]  Note the high snowbanks, that would make it difficult for those in a chair van to navigate.

Also note the parked car (I’ve obscured the plate.)  Current HP placards are hung from the rear-view mirror;  I didn’t see one. 

My colleague Dave Martel has been after the Y to shovel its HP spaces;   he’s a reader of my blog, I wonder what he’ll find?

Update:  I’ve heard from Dave;  the city or its plowing contractor at the Y is doing a better job this year.  We may yet get through the rest of this winter without a serious problem.

Sunday, January 4, 2009

State Wants Fines for Parking in MBTA Stops

451 at Walgreens, Salem (2) resized

According to Neighborhood Access Group and Starts and Stops, there is a bill on the Governor’s desk that would fine motorists who park at T bus stops.  The fine is $100, about in line with fines assessed for parking in HP spots.

Quoting the Globe article:

[Grabauskas] hopes a higher fine - coupled with enforcement by Transit Police and local forces - will help drivers remember. "We wanted to make sure people knew it was a serious matter, that was impacting the safety of all passengers," he said.

The inability to get to the curb is a top complaint of both passengers and bus drivers, Grabauskas said. The T has been training drivers to do a better job in that effort as part of the $310 million class-action settlement with disabled passengers in 2006, he said.

Still, members of the T Riders Union have continued to complain publicly about obstacles for disabled riders, including rude behavior from drivers and long distances to the curb. A spokesman for the riders' union could not be reached Friday.

Unlike parking at HP spots, parking at T stops tends to be short-term by drivers “just stopping for a minute”.  By the time the cops come to direct traffic, the cars are gone.  So I’m not the most optimistic.

In some ways, the courtesy of T drivers, or lack of, worries me more than the parking issues;  it is also something the T can do something about from management level downwards.  Good luck with that.

UPDATE:  Governor Patrick has signed the bill.

Wednesday, December 31, 2008

MBTA service changes for Winter 2008-2009

Last fall, the MBTA released its service plan for 2008 and I reported on the changes that the MBTA proposed for bus service to Salem.  The biggest changes were to route 465, where one trip on Saturday was to be eliminated, and to route 450 and 456, which would run less frequently due to traffic congestion.

This week, the Winter 2008 schedule changes were published on the MBTA website.  The only change that affects Salem is on the 465. Weekday trips leaving Salem to Danvers now leave at :45 past the hour, 5 minutes later than usual.  Saturday trips depart at :05 past the hour to Danvers.  Buses to Salem from Danvers leave Liberty Tree Mall a few minutes earlier than previously.  Since buses to Danvers come from Beverly on their way to Salem, I presume that traffic congestion in Beverly is the cause.  (The 451 and 465 are run together as one long metaroute.  I seldom ride the 451 and have not ridden it to North Beverly in years, so no first hand experience here.)  No changes to Beverly service.

The change that was threatened—dropping certain Saturday morning trips on the 465—has not happened so far.  There were also no changes to the 450 for the winter.  Of course, commuter rail is not changed.

MBTA schedules are revised seasonally, and can change.  The last big change to bus service was in the summer schedule of 2002, when virtually every North Shore bus route was revised, rerouted or eliminated.  It was mostly for the good then, and today’s schedule change isn’t a big deal.

But with the T’s budget as it is now, the future is darker.